South Main Street Road and Shared Use Path - Approx. 750 ft
Federal opportunity from WB001 - Town of Williamsburg • Town of Williamsburg. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: NAICS 30, 12, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
South Main Street Road and Shared Use Path - Approx. 750 ft
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Williamsburg is seeking bids for the construction of a 750 ft segment of South Main Street Road and an adjoining Shared Use Path. This project aims to enhance transportation infrastructure within the town, providing safer access for both vehicles and pedestrians. Bids are due by March 19, 2026, indicating a timeframe for preparation and submission.
The Town of Williamsburg intends to improve local transportation by constructing a road and shared use path, promoting both vehicle mobility and pedestrian safety.
- General contractors with civil engineering expertise
- Companies experienced in road construction
- Firms with a history in pedestrian infrastructure projects
- Design of road and path
- Site preparation
- Material procurement
- Construction of road and path
- Quality assurance and testing
- Company profile and qualifications
- Detailed project plan
- Proposed schedule
- Pricing breakdown
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local construction regulations
- Adhere to environmental regulations during construction
- Competitive pricing based on local market rates
- Consider bundling materials and labor for cost efficiency
- Partner with local subcontractors for site work
- Utilize local suppliers for materials
- Potential delays due to weather conditions
- Supply chain issues affecting material availability
- What are the specific materials required for the path?
- Are there any existing utilities that need to be accommodated during construction?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for the road and path
- Estimated budget or funding sources
- Current condition of the site
- Any permits required before starting
- Existing traffic patterns or studies
- Local community input or concerns
- Prioritization or importance level of this project
- Historical data on similar past projects
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.