Improvements to the Onset Pier Buildings
Federal opportunity from WRHAM - Administration • Town of Wareham. Place of performance: MA. Response deadline: Apr 16, 2026. Industry: NAICS 30, 19, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
Onset Pier Improvements to Building Project. The Base Bid scope of work for the project is to install and furnish all labor, materials, and equipment, and to perform all operations required for renovations toone Onset Pier building, the Harbormaster Office. Work includes new roofing, siding, windows, doors, and trim. Bid Alternate 1 scope of work as noted on the drawings will include renovations of the Ticket Booth, including new roofing, siding, window and exterior door.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Onset Pier Improvements to Building Project, managed by WRHAM - Administration, aims to renovate the Harbormaster Office and the Ticket Booth. The base bid includes essential upgrades such as new roofing, siding, windows, and doors for the Harbormaster Office, with a planned bid alternate for the Ticket Booth. This project presents a solid opportunity for contractors experienced in building renovations within coastal areas.
The buyer is seeking qualified contractors to perform extensive renovations to buildings at Onset Pier, ensuring structural integrity and enhancing aesthetic appeal.
- Contractors with experience in building renovations
- Firms specializing in coastal construction
- Local construction companies familiar with the area
- Renovations to Harbormaster Office
- New roofing installation
- Replacement of siding, windows, and doors
- Renovations to Ticket Booth as a bid alternate
- Completed bid form
- Detailed project timeline
- Qualifications and experience of key personnel
- Bid pricing for base and alternate scopes
- Proof of relevant certifications and licenses
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with local building codes
- Adherence to any environmental regulations due to coastal location
- Consider competitive pricing for base bid and alternates
- Include contingencies for unexpected site conditions
- Review past projects to benchmark costs
- Consider partnering with local subcontractors for specialized trades
- Explore collaboration with firms that have historical knowledge of the site
- Potential environmental impact challenges due to coastal renovations
- Weather-related delays during construction
- Material availability and cost fluctuations
- What are the specific timelines for project approvals?
- Are there any previous studies or assessments conducted on the buildings?
- What measures are in place for ensuring timely material deliveries?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Absence of specific performance period details
- No solicitation number provided
- Lack of detailed project drawings or specifications
- No information on site access constraints
- No local contractors' database for outreach
- No previous renovation history of the buildings
- Missing environmental assessment reports
- No detail on funding sources or budget limits
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.