Corn Hill Beach Parking Lot Improvements
Federal opportunity from TOT02 - Town of Truro • Town of Truro. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: NAICS UNSPSC 30-12-16.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 30-12-16
Description
The Town of Truro is seeking sealed bids to install and furnish all labor, materials and equipment, and to perform all operations required for the Corn Hill Beach Parking Lot Improvements. Bid specifications may be obtained from https://www.truro-ma.gov under Bids and Proposals
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Truro is soliciting sealed bids for the Corn Hill Beach Parking Lot Improvements, which require complete installation and furnishing of all necessary labor, materials, and equipment. This opportunity emphasizes the need for detailed proposals to meet the specifications provided by the town. Bids must be submitted by March 12, 2026, highlighting the project's long timeline for planning and execution.
The Town of Truro aims to enhance the infrastructure of the Corn Hill Beach Parking Lot through comprehensive improvements, ensuring safer and more efficient access for visitors.
- Install and furnish all labor
- Provide required materials
- Equip the site for improvement operations
- Ensure compliance with local regulations
- Signed bid proposal
- Detailed project plan
- List of materials and equipment to be used
- Proof of relevant experience
- Pricing breakdown
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed bid specifications are not provided in the notice
- Current condition of Corn Hill Beach Parking Lot is unclear
- Any available funding or budget constraints are unspecified
- Other relevant local projects that may impact this timeline aren't mentioned
- Any specific environmental considerations for the project are not detailed
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.