Flynn Building Exterior Accessible Ramp Replacement
Federal opportunity from FACIL - Facilities Dept • Town of Sudbury. Place of performance: MA. Response deadline: Apr 03, 2026. Industry: NAICS 22, 10, 19.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 22
Description
Flynn Building Exterior Accessible Ramp Replacement, work consisting of the selective demolition and exterior accessible ramp component replacement at the Alan Flynn Building.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Flynn Building Exterior Accessible Ramp Replacement opportunity involves significant work at the Alan Flynn Building, primarily focusing on selective demolition and replacing the exterior accessible ramp. This project underscores the agency's commitment to enhancing accessibility, with a response deadline set for April 3, 2026. Bidders will need to provide evidence of capability in similar construction projects to win the contract.
The buyer is seeking a contractor to execute the selective demolition and replacement of the exterior accessible ramp at the Alan Flynn Building, aiming to improve accessibility.
- Contractors experienced in demolition and construction
- Companies with a track record of similar accessibility projects
- Local contractors familiar with facility construction standards
- Selective demolition of existing ramp
- Construction of new exterior accessible ramp
- Site cleanup and restoration
- Evidence of previous similar project experience
- Technical approach and methodologies
- Cost proposal with detailed breakdown
- Timeline for project completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to local building codes
- Compliance with ADA accessibility standards
- Consider competitive pricing due to potential local contractors
- Factor in costs for materials and labor in construction
- Consider teaming with subcontractors specialized in accessibility solutions
- Engage local demolition firms for efficiency and compliance
- Potential delays due to unforeseen conditions during demolition
- Challenges in sourcing accessibility compliant materials
- Regulatory compliance issues related to accessibility standards
- What specific accessibility standards must the new ramp meet?
- Are there any site-specific regulations or considerations?
- What is the timeline for permits and inspections?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Posted date not provided
- Additional specification details for the ramp design are missing
- No pre-bid meeting information available
- Solicitation number is not listed
- Details on contractor qualifications are unclear
- Information on bonding or insurance requirements is missing
- No attachment description provided aside from link
- No history of past contracts listed
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.