Skip to content
Town of Sudbury

Old Sudbury Rd Culverts 110 and 149 Replacement Project

Solicitation: Not available
Notice ID: ma_commbuys_918ce002bea67b414951
NAICS 72, 14, 11DepartmentTown of SudburyAgencyDpwsud - DpwStateMAPostedDueApr 23, 2026, 11:00 AM UTCCloses in 5 days

Federal opportunity from DPWSUD - DPW • Town of Sudbury. Place of performance: MA. Response deadline: Apr 23, 2026. Industry: NAICS 72, 14, 11.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Denise Barter 275 Old Sudbury Rd Sudbury, MA 01776 US Email: barterd@sudbury.ma.us Phone: (978) 440-5422
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260023 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260018 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Essex
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
POWER EQUIPMENT OPERATOR (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Sudbury
Agency
DPWSUD - DPW
Subagency
DPWSUD - DPW
Office
Denise Barter
Contracting Office Address
Not available

Description

Town of Sudbury, MA (Owner) invites Bidders to submit ELECTRONIC sealed Bids for the Old Sudbury Road Culverts 110 and 149 Replacement Project Contract No. 2026-OSRC-1 which includes the replacement of box and pipe culverts including full depth pavement reconstruction on Old Sudbury Road. Work shall commence by June 12th, 2026. Substantial Completion: within 116 days. Final Completion: within 130 days. Bidding is per MGL Chapter 30 s39M. Prevailing wage rates.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 03, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

DPWSUD - DPW issued solicitation Old Sudbury Rd Culverts 110 and 149 Replacement Project, with NAICS 72, 14, 11. Town of Sudbury, MA (Owner) invites Bidders to submit ELECTRONIC sealed Bids for the Old Sudbury Road Culverts 110 and 149 Replacement Project Contract No. 2026-OSRC-1 which includes the replacement of box and pipe culverts including full depth pavement reconstruction on Old Sudbury Road.

Old Sudbury Rd Culverts 110 and 149 Replacement ProjectDPWSUD - DPW721411
What the buyer is trying to do

Town of Sudbury, MA (Owner) invites Bidders to submit ELECTRONIC sealed Bids for the Old Sudbury Road Culverts 110 and 149 Replacement Project Contract No. 2026-OSRC-1 which includes the replacement of box and pipe culverts including full depth pavement reconstruction on Old Sudbury Road. Work shall commence by June 12th, 2026. Substantial Completion: within 116 days.

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
  • Teams aligned to NAICS 72, 14, 11.
Work breakdown
  • Old Sudbury Rd Culverts 110 and 149 Replacement Project
  • Review 1 linked source document.
  • Work shall commence by June 12th, 2026.
  • Substantial Completion: within 116 days.
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Notice aligns to NAICS 72, 14, 11.
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is Apr 23, 2026; verify exact due time and timezone.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.