Skip to content
Town of Shrewsbury

Shrewsbury Council on Aging-ADA Parking and Sidewalk Accessibility Improvements

Solicitation: Not available
Notice ID: ma_commbuys_9944f240be0b9352eab7
DepartmentTown of ShrewsburyAgencyTMNGR - Town ManagerStateMAPostedDueApr 21, 2026, 01:00 PM UTCCloses in 10 days

Federal opportunity from TMNGR - Town Manager • Town of Shrewsbury. Place of performance: MA. Response deadline: Apr 21, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,212,353,333
Sector total $7,212,353,333 • Share 100.0%
Live
Median
$233,223
P10–P90
$30,957$1,295,712
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,212,353,333)
Deal sizing
$233,223 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Kevin J. Mizikar 100 Maple Avenue Shrewsbury, MA 01545 US Email: kmizikar@shrewsburyma.gov Phone: (508) 841-8508
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Shrewsbury
Agency
TMNGR - Town Manager
Subagency
TMNGR - Town Manager
Office
Jeffrey Goodwin
Contracting Office Address
Not available

Description

Shrewsbury invites sealed bids for ADA Parking and Sidewalk Accessibility Improvements at Shrewsbury Council on Aging. Contractors must submit bids in conformance with this Invitation for Bids and the related documents which shall be available online at www.shrewsburyma.gov/bids and also in the Office of the Town Manager at 100 Maple Ave. in Shrewsbury. Contractors must be pre-qualified with Mass DOT with the class of work as Highway Sidewalk and Curbing with an estimated value of $74,207.90.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 30, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The Town of Shrewsbury is seeking sealed bids for ADA Parking and Sidewalk Accessibility Improvements at the Shrewsbury Council on Aging, with a project value estimated at $74,207.90. Contractors must be pre-qualified with Mass DOT for Highway Sidewalk and Curbing work. Bids are due by April 21, 2026, and must adhere to the provided specifications.

ADA compliancesidewalk improvementsmunicipal projectShrewsbury Council on Agingbidding documents
What the buyer is trying to do

Shrewsbury aims to enhance accessibility at the Council on Aging through ADA-compliant parking and sidewalk improvements.

Who should pursue this
  • Contractors qualified by Mass DOT
  • Companies experienced in ADA compliance work
  • Firms with a history of municipal project execution
Work breakdown
  • Conduct site assessment
  • Prepare and submit bid documents
  • Implement ADA-compliant parking modifications
  • Construct new sidewalks and curbing
  • Conduct quality assurance inspections
Response package checklist
  • Cover letter
  • Bid form
  • List of relevant projects
  • Proof of Mass DOT pre-qualification
  • Cost proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with ADA standards
  • Compliance with local bid regulations required
Pricing strategy
  • Estimate based on the project value of $74,207.90
  • Consider competitive pricing while ensuring compliance and quality
Teaming and subs
  • Consider partnerships with local subcontractors who specialize in ADA features
  • Collaborate with engineering firms for design and compliance support
Risks and watchouts
  • Bidder pre-qualification status must be verified
  • Ensure accurate estimating to avoid underbidding due to project value
  • Monitor changes in local regulations affecting ADA compliance
Smart questions to ask
  • What specific ADA compliance measures must be met?
  • Are there existing plans or designs available for review?
  • What is the expected timeline for project completion after bid award?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific solicitation number provided
  • No detailed contact information for the Town Manager
  • No specific requirements on bid submission format
  • No timeline for project initiation after bid acceptance
  • Lack of existing documents related to the project
  • No information on potential bidder restrictions
  • No description of landscape or environmental considerations
  • No construction phase duration provided

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.