#RC-26-03 Elevator - for the Reading Center for Living
Federal opportunity from FAC62 - Facilities • Town of Reading. Place of performance: MA. Response deadline: Feb 19, 2026. Industry: NAICS 72, 15, 40.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 44 more rate previews.↓
Point of Contact
Agency & Office
Description
#RC-26-03 Elevator - for the Reading Center for Living
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity #RC-26-03 involves the installation of an elevator at the Reading Center for Living, as specified by the Facilities agency (FAC62). This project has a response deadline of February 19, 2026, presenting a significant timeframe for planning and execution. Bidders are encouraged to review the detailed requirements available in the linked attachment.
The buyer is looking to procure an elevator installation for the Reading Center for Living, ensuring accessibility and compliance with relevant standards.
- Elevator installation contractors
- Construction firms with experience in accessibility projects
- Engineering firms specializing in vertical transportation
- Site assessment and preparation
- Elevator design and engineering
- Installation of elevator system
- Testing and inspection to meet safety codes
- Final project reporting and documentation
- Proof of previous elevator installation projects
- Detailed project timeline and deliverables
- Pricing breakdown by phases
- Certificates of insurance and bonding
- References from past clients
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to local building codes
- Compliance with the Americans with Disabilities Act (ADA)
- Safety and inspection regulations for elevator systems
- Breakdown of costs by labor, materials, and overhead
- Consideration for potential change orders during installation
- Competitive pricing while ensuring quality standards
- Potential to team with local engineers for design
- Subcontracting to specialized elevator companies for installation
- Collaborating with safety inspection agencies
- Delays in materials delivery impacting project timeline
- Compliance issues with building codes and ADA
- Potential for budget overruns due to unforeseen site conditions
- What specific building codes must be adhered to for this installation?
- Are there any expected utility interruptions during the installation process?
- What are the anticipated challenges in site preparation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details about the existing site conditions
- Specific technical requirements for the elevator
- Information on any previous attempts or studies
- The budget range allocated for the project
- Current status of project approvals
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.