RFP �¢?? Wheeler Memorial Library Roof Replacement Bidding & Construction Oversight
Federal opportunity from TH0001 - Town Hall • Town of Orange. Place of performance: MA. Response deadline: Mar 18, 2026. Industry: NAICS UNSPSC 81-10-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Incumbent & Expiration Tracking
Competitive Heat Score
Competition likely above baseline. Prioritize compliance speed and win themes early.
- Deadline pressure: Closes in 19 days.
- Competition pool: Open competition (no set-aside detected).
- Market crowding: 5 nearby NAICS matches found.
Point of Contact
Agency & Office
More in NAICS UNSPSC 81-10-15
Description
Town of Orange seeks a consultant to manage public bidding and provide construction oversight for the Wheeler Memorial Library Roof Replacement at 49 East Main St. Fixed fee is 54390. Submit 5 technical proposals and 1 sealed price form by 3 PM on 3 18 2026 to 6 Prospect St Orange MA 01364. Hard copy only. Contact Brian McHugh at 413 223 5224 or bmchugh@fcrhra.org.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Orange is seeking a consultant for the Wheeler Memorial Library Roof Replacement project, which includes managing public bidding and providing construction oversight. The deadline for submission is March 18, 2026, at 3 PM, with a fixed fee of $54,390 for the services. Interested parties must submit five technical proposals and one sealed price form as hard copies to the designated address in Orange, MA.
The buyer aims to identify a consultant who will oversee the public bidding process and provide oversight during the construction of the library roof replacement.
- Manage public bidding process
- Provide construction oversight
- Submit required documentation including technical proposals and price form
- Five technical proposals
- One sealed price form
- Hard copy submissions only
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific contractor or firm qualifications provided
- Details on project timeline missing
- No information on prior projects for benchmarking
- Lack of context on current roof condition
- No information on potential design requirements
- No guidelines on local codes or regulations
- Additional constraints on submissions or project management are not specified
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.