Fiber Extension - Plain St
Federal opportunity from NAED - N A Electric Department • Town of North Attleboro. Place of performance: MA. Response deadline: Feb 23, 2026. Industry: NAICS 83, 11, 23.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 44 more rate previews.↓
Point of Contact
Agency & Office
Description
Pursuant to M.G.L. c. 30, 39M, the North Attleborough Electric Department (NAED) invites qualified persons to submit quotes to install an extension of our current fiber network (approximately 1,610 feet)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The North Attleborough Electric Department (NAED) is seeking qualified bidders for a project to install approximately 1,610 feet of fiber network extension. The deadline for quote submissions is set for February 23, 2026. This opportunity is governed by Massachusetts General Law (M.G.L.) c. 30, 39M, requiring compliance with specific bidding regulations.
Install an extension of the existing fiber network to enhance connectivity. The project will involve the installation of approximately 1,610 feet of fiber cabling.
- Telecommunications contractors
- Fiber optic installation specialists
- Electrical contractors with experience in network installations
- Review and comply with Massachusetts General Law (M.G.L. c. 30, 39M)
- Conduct site assessments for fiber network installation
- Prepare project plans and specifications
- Install the fiber network extension
- Test and certify the installation for performance
- Completed quote form
- Evidence of compliance with M.G.L. c. 30, 39M
- Proof of insurance and bonding
- List of relevant project experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to M.G.L. c. 30, 39M is mandatory
- Bidders must be able to meet state licensing requirements
- Consider industry benchmarks for fiber installation per foot
- Factor in potential site-specific challenges that may affect costs
- Partner with local subcontractors for specialized tasks
- Consider teaming with electrical engineering firms for infrastructure support
- Potential delays due to regulatory approvals
- Weather conditions impacting installation timelines
- Unforeseen underground utility conflicts
- What specific site conditions should be accounted for in planning?
- Are there any existing infrastructures that may impact installation?
- What is the expected timeline for project approvals?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific funding details provided
- No information on existing infrastructure conditions
- Lack of detailed specifications for fiber type
- No clarity on installation timelines
- No information on payment terms or project milestones
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.