Water Treatment Plant Doors
Federal opportunity from NA001 - North Andover Town Manager • Town of North Andover. Place of performance: MA. Response deadline: Mar 10, 2026. Industry: NAICS 72, 10, 29.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 44 more rate previews.↓
Point of Contact
Agency & Office
Description
The Town of North Andover is soliciting bids from qualified contractors to supply and install new metal front doors at the Water Treatment Plant. The complete IFB is available at bidnetdirect.com/massachusetts/northandoverma.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of North Andover is seeking bids for the supply and installation of new metal front doors at the Water Treatment Plant, with a response deadline set for March 10, 2026. This opportunity falls under UNSPSC 72-10-29, indicating a focus on building materials and services. Contractors interested in this project should review the complete Invitation for Bid (IFB) available on bidnetdirect.com for specific requirements and details.
The buyer aims to enhance the security and functionality of the Water Treatment Plant by replacing the existing front doors with new metal alternatives.
- Contractors specializing in commercial door installation
- Companies with experience in municipal projects
- Vendors familiar with metal construction materials
- Review of IFB on bidnetdirect.com
- Preparation of bid proposal
- Site evaluation and measurement (if required)
- Submission of bid by deadline March 10, 2026
- Installation of new metal doors upon award
- Completed bid proposal
- Certifications of qualifications
- Specification compliance statement
- Cost breakdown for materials and installation
- Timeline for project completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local building codes
- Compliance with safety regulations during installation
- Propose competitive pricing while ensuring quality materials
- Consider bulk purchasing discounts for metal materials
- Form partnerships with local suppliers for materials
- Collaborate with subcontractors experienced in door installation
- Potential delays in supply chain for materials
- Unforeseen site conditions during installation
- Regulatory compliance issues during installation
- What are the specific security requirements for the new doors?
- Are there any current issues with the existing doors that need addressing in the new design?
- What is the expected timeline for project award and installation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific dimensions and specifications for the doors are not provided
- Installation site conditions are unspecified
- Current condition of existing doors is unclear
- Potential need for permits or approvals isn't mentioned
- Not clear if there are any preferred manufacturers or brands for materials
- Details on warranty or maintenance requirements are missing
- Clarification on payment terms expected is not included
- No information about pre-bid meetings or inquiries is available
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.