Playground Equipment Purchase and Installation
Federal opportunity from TM188 - Town of Middlefield • Town of Middlefield. Place of performance: MA. Response deadline: Mar 04, 2026. Industry: NAICS UNSPSC 49-24-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 49-24-15
Description
The Town of Middlefield seeks written quotes for the purchase and installation of certain playground equipment at 169 Skyline Trail.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Middlefield (TM188) is seeking written quotes for the purchase and installation of playground equipment at 169 Skyline Trail. Responses are due by 2026-03-04 14:00 UTC. This appears to be a straightforward supply-plus-install job, but the actual equipment list, site constraints, and installation requirements likely live in the two CommBuys attachments. Prioritize quickly reviewing those attachments to confirm scope, safety/compliance expectations, and any sitework responsibilities before deciding bid/no-bid.
Buy and have installed specific playground equipment at a single named location (169 Skyline Trail) via written quotes, presumably as a turnkey procurement covering equipment supply and installation services.
- Review solicitation attachments on CommBuys for the exact equipment list/specs and quote instructions
- Provide written quote for playground equipment purchase (per specified models/features) and delivery to 169 Skyline Trail
- Provide installation of the specified playground equipment at 169 Skyline Trail
- Coordinate site access and installation logistics with the Town of Middlefield
- Written quote (as requested by the Town of Middlefield) covering purchase and installation
- Line-item pricing separating equipment, delivery, installation (and any optional items if allowed by attachments)
- Project approach/plan for installation at 169 Skyline Trail (site access, crew, duration)
- Any required product cut sheets/spec sheets for the quoted playground equipment (confirm in attachments)
- Acknowledgment of any requirements contained in the two CommBuys attachments (addenda/terms/specifications)
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Contents of the two CommBuys attachments (equipment list/specs, installation requirements, quote instructions/terms)
- Solicitation number and notice type
- Evaluation/award criteria
- Period of performance or required completion date
- Whether alternates/approved equals are permitted
- Any requirements for site prep/surfacing/removal of existing equipment at 169 Skyline Trail
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.