IFB - Village St at Holliston St Complete Streets Improvement
Federal opportunity from TABOS - Town Manager • Town of Medway. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: NAICS 30, 12, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
IFB for complete street improvements at Village St at Holliston St. Bid doc available at https://medwayma.gov/purchasing/ or DPW Office, 45B Holliston St, Door 9, Medway during business hours. Select Board awards the contract. Est. value: $782K.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Medway is seeking bids for the IFB concerning complete street improvements at Village St at Holliston St. The estimated value of the project is $782,000, with bids due by March 19, 2026. Bid documents can be obtained from the Town's website or the DPW Office. This project is an opportunity for firms specializing in street improvements to engage in a significant municipal contract in the region.
The Town Manager's office aims to improve the streetscape and infrastructure at the intersection of Village St and Holliston St to enhance transportation safety and accessibility.
- Construction firms with experience in complete street improvement projects.
- Civil engineering firms that focus on municipal contracts.
- Subcontractors specializing in paving, landscaping, and traffic management.
- Obtain bid documents from the provided sources.
- Prepare and submit bid proposal.
- Address any questions or clarifications regarding the project.
- Implement the complete street improvements as per specifications.
- Coordinate with the Select Board for contract award.
- Completed bid proposal form.
- Proof of experience and previous projects.
- Financial bid and cost breakdown.
- Timeline for project completion.
- Any required licenses and certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local construction codes and regulations.
- Verify compliance with any state funding requirements.
- Bid competitively while considering costs associated with materials and labor.
- Take into account local economic factors that may affect pricing.
- Potential teaming with local subcontractors to enhance community relations.
- Collaboration with civil engineering firms for design compliance.
- Potential delays in permitting and approvals that could impact project timeline.
- Scope changes that might arise during the construction phase.
- What specific improvements are prioritized at the intersection?
- Are there any unique local compliance requirements to be aware of?
- What is the timeline for project selection and award?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific technical requirements for the complete street improvements are not detailed.
- Details about community engagement or public feedback isn't provided.
- Information on existing conditions at the site is absent.
- No mention of required bonding or insurance levels for bidders.
- Lack of specifics on potential funding sources or grants for the project.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.