RFQ for Prequalification of GC and Filed Subcontractors for Quashnet School HVAC & Sprinkler Upgrade
Federal opportunity from DPW03 - Department of Pubic Works • Town of Mashpee. Place of performance: MA. Response deadline: Mar 20, 2026. Industry: NAICS UNSPSC 72-12-14, 72-15-26, 72-15-21, 72-15-13, 72-15-11.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Town of Mashpee requests Statements of Qualifications (RFQ) for General Contractors and Filed Subcontractors for prequalification for the Mashpee Quashnet Intermediate School HVAC and Sprinkler Upgrade Project. Respondents must be DCAMM certified. RFQ documents shall be available online at BidDocs.com.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Mashpee is requesting Statements of Qualifications (RFQ) to prequalify General Contractors and Filed Subcontractors for the Mashpee Quashnet Intermediate School HVAC and Sprinkler Upgrade Project. Respondents must be DCAMM certified, making Massachusetts public construction eligibility a gating requirement. Qualifications are due by 2026-03-20T14:00:00+00:00. RFQ documents are stated to be available via BidDocs.com, which likely contains the detailed prequalification instructions and required forms.
Establish a prequalified pool of DCAMM-certified General Contractors and Filed Subcontractors eligible to compete for the Quashnet Intermediate School HVAC and sprinkler upgrade work for the Town of Mashpee.
- Prepare and submit Statement of Qualifications for prequalification (General Contractor and/or Filed Subcontractor).
- Demonstrate current DCAMM certification status appropriate to the intended role (GC and/or filed subcontract category).
- Provide qualifications demonstrating capability to perform an HVAC upgrade and sprinkler system upgrade in a school facility (Quashnet Intermediate School).
- Access and comply with RFQ requirements and submission instructions located on BidDocs.com.
- Statement of Qualifications (SOQ) for prequalification (GC and/or filed subcontractor).
- Evidence of DCAMM certification (current and applicable to the submitting entity’s role).
- Qualifications narratives and project experience specific to HVAC upgrades and sprinkler system upgrades.
- Any BidDocs.com RFQ forms, affidavits, certifications, and required attachments exactly as instructed.
- Submission completed by 2026-03-20T14:00:00+00:00 per the notice.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Link or contents of the RFQ package on BidDocs.com (required forms, submission method, evaluation criteria, DCAMM categories).
- Solicitation number / RFQ identifier beyond the notice ID.
- Place of performance address and any site constraints (occupied school, phasing, working hours).
- Period of performance / anticipated construction schedule.
- Specific filed subcontractor trades/categories being prequalified (beyond the general HVAC and sprinkler upgrade description).
- Any stated minimum DCAMM bid limits, bonding requirements, or insurance thresholds.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.