Skip to content
Town of Lincoln

Pierce House Roof Railing Removal, Restoration and Reinstallation

Solicitation: Not available
Notice ID: ma_commbuys_ae3da14cd2652705308f
NAICS 72, 15, 23DepartmentTown of LincolnAgencyTOL01 - Town of LincolnStateMAPostedDueFeb 18, 2026, 09:00 AM UTCExpired

Federal opportunity from TOL01 - Town of Lincoln • Town of Lincoln. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS 72, 15, 23.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Daniel Pereira 16 Lincoln Road Town of Lincoln, MA 01773 US Email: pereirad@lincolntown.org Phone: (781) 259-2603
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Lincoln
Agency
TOL01 - Town of Lincoln
Subagency
TOL01 - Town of Lincoln
Office
Daniel Pereira
Contracting Office Address
Not available

Description

The Town of Lincoln Pierce House is soliciting written quotes for removal, restoration and reinstallation of the existing decorative roof balustrade/railing assemblies to facilitate replacement of the roof system (roof replacement by others). The project is located at 17 Weston Road, Lincoln, MA. This work is being procured under M.G.L. c. 149. Prevailing Wage Rates apply.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Lincoln is seeking quotes for the removal, restoration, and reinstallation of the decorative roof balustrade at the Pierce House, located at 17 Weston Road, Lincoln, MA. This project is a crucial step to facilitate the roof system replacement by others, and compliance with prevailing wage rates under M.G.L. c. 149 is required. Bids are due by February 18, 2026, which offers ample time for preparation, although early engagement is advisable.

roof railing removalrestorationprevailing wagehistorical restorationLincoln MA
What the buyer is trying to do

The buyer aims to hire a contractor for the careful removal, restoration, and reinstallation of decorative roof railings to support a roofing replacement project. Compliance with local labor regulations and maintaining the aesthetic integrity of the historical structure are likely priorities.

Who should pursue this
  • Contractors with experience in historical restoration
  • Companies familiar with Massachusetts prevailing wage laws
  • Professionals with roofing project collaboration experience
Work breakdown
  • Assessment of existing railing condition
  • Removal of existing railings
  • Restoration of railings
  • Reinstallation of railings
  • Coordination with roofing contractor
Response package checklist
  • Detailed quote including labor and materials
  • Proof of previous similar project experience
  • Compliance with prevailing wage rates documentation
  • Timeline for project completion
  • Insurance and bonding information
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to M.G.L. c. 149 regarding prevailing wage
  • Documentation required to prove compliance with labor standards
Pricing strategy
  • Consider labor intensity due to restoration requirements
  • Include contingencies for unexpected restoration costs
  • Factor in the timing of labor to align with the roofing project
Teaming and subs
  • Partner with a roofing company for seamless project execution
  • Engage subcontractors specializing in historical restorations
Risks and watchouts
  • Potential delays in restoration affecting roofing timeline
  • Compliance issues related to prevailing wage rates
  • Unexpected structural issues during removal
Smart questions to ask
  • Are there any specific restoration techniques preferred?
  • What is the expected timeline for the roof replacement?
  • What budget constraints should be considered?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Solicitation number is not provided
  • No posted date available
  • Period of performance details are missing
  • Specific details on the type of restoration are unspecified

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.