Pierce House Roof Railing Removal, Restoration and Reinstallation
Federal opportunity from TOL01 - Town of Lincoln • Town of Lincoln. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS 72, 15, 23.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
The Town of Lincoln Pierce House is soliciting written quotes for removal, restoration and reinstallation of the existing decorative roof balustrade/railing assemblies to facilitate replacement of the roof system (roof replacement by others). The project is located at 17 Weston Road, Lincoln, MA. This work is being procured under M.G.L. c. 149. Prevailing Wage Rates apply.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Lincoln is seeking quotes for the removal, restoration, and reinstallation of the decorative roof balustrade at the Pierce House, located at 17 Weston Road, Lincoln, MA. This project is a crucial step to facilitate the roof system replacement by others, and compliance with prevailing wage rates under M.G.L. c. 149 is required. Bids are due by February 18, 2026, which offers ample time for preparation, although early engagement is advisable.
The buyer aims to hire a contractor for the careful removal, restoration, and reinstallation of decorative roof railings to support a roofing replacement project. Compliance with local labor regulations and maintaining the aesthetic integrity of the historical structure are likely priorities.
- Contractors with experience in historical restoration
- Companies familiar with Massachusetts prevailing wage laws
- Professionals with roofing project collaboration experience
- Assessment of existing railing condition
- Removal of existing railings
- Restoration of railings
- Reinstallation of railings
- Coordination with roofing contractor
- Detailed quote including labor and materials
- Proof of previous similar project experience
- Compliance with prevailing wage rates documentation
- Timeline for project completion
- Insurance and bonding information
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to M.G.L. c. 149 regarding prevailing wage
- Documentation required to prove compliance with labor standards
- Consider labor intensity due to restoration requirements
- Include contingencies for unexpected restoration costs
- Factor in the timing of labor to align with the roofing project
- Partner with a roofing company for seamless project execution
- Engage subcontractors specializing in historical restorations
- Potential delays in restoration affecting roofing timeline
- Compliance issues related to prevailing wage rates
- Unexpected structural issues during removal
- Are there any specific restoration techniques preferred?
- What is the expected timeline for the roof replacement?
- What budget constraints should be considered?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Solicitation number is not provided
- No posted date available
- Period of performance details are missing
- Specific details on the type of restoration are unspecified
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.