Skip to content
Town of Lancaster

2026 Water Main Upgrades

Solicitation: Not available
Notice ID: ma_commbuys_95267a3fcb433df8b414
NAICS 83, 10, 15DepartmentTown of LancasterAgencyLAN01 - Town of LancasterStateMAPostedDueMar 20, 2026, 01:00 PM UTCExpired

Federal opportunity from LAN01 - Town of Lancaster • Town of Lancaster. Place of performance: MA. Response deadline: Mar 20, 2026. Industry: NAICS 83, 10, 15.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
John Woodsmall 695 Main Street Suite 1 Lancaster, MA 01523 US Email: jwoodsmall@lancasterma.gov Phone: (978) 365-3326 Ext. 1016 FAX: (978) 368-8486
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Lancaster
Agency
LAN01 - Town of Lancaster
Subagency
LAN01 - Town of Lancaster
Office
John Woodsmall
Contracting Office Address
Not available

Description

2026 Water Main Improvements

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Lancaster is seeking services for the 2026 Water Main Improvements, a project focusing on enhancing the water supply infrastructure. Bids are due by March 20, 2026, making it essential for interested parties to prepare promptly. The opportunity is categorized under NAICS codes 83, 10, and 15, indicating a focus on public administration and utilities.

Water main upgradesLancaster utilitiesMunicipal infrastructurePipe installationUtility contractors
What the buyer is trying to do

The Town of Lancaster aims to upgrade its water main infrastructure to improve efficiency and service delivery in the community.

Who should pursue this
  • Utility contractors with experience in pipeline installation
  • Engineering firms specializing in water infrastructure
  • Local contractors familiar with municipal projects
Work breakdown
  • Assessment of existing water main conditions
  • Design and engineering upgrades
  • Replacement of outdated pipes
  • Installation of new water mains
  • Testing and inspections upon completion
Response package checklist
  • Bid proposal
  • Proof of previous project experience
  • Cost estimates
  • Timeline for project completion
  • Licenses and certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All bids must comply with local regulations and codes
  • Bidders must provide evidence of insurance and bonding capabilities
Pricing strategy
  • Competitive pricing based on current market rates for materials and labor
  • Consider potential cost-saving methods in project execution
Teaming and subs
  • Consider partnering with local subcontractors who have established relationships with the Town of Lancaster
  • Explore teaming arrangements with engineering firms for design efficiency
Risks and watchouts
  • Potential delays due to permitting processes
  • Unforeseen underground conditions during excavation
  • Variability in material costs leading to budget overruns
Smart questions to ask
  • What specific regulations must be adhered to during construction?
  • Are there limitations on work hours or community impact considerations?
  • What is the anticipated budget range for the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work not specified
  • Estimated budget for the project not disclosed
  • Information on current water main conditions is missing
  • No information on previous similar projects
  • No stakeholder contact information provided

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.