Supply and installation of Gas Range Griddle in Senior Center
Federal opportunity from HOPKINTOWN - Town of Hopkinton • Town of Hopkinton. Place of performance: MA. Response deadline: Apr 15, 2026. Industry: NAICS 48, 10, 15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
The Town of Hopkinton is looking to get a quotation for supply and installation of the Southbend 60 inch range Griddle in the Senior Center kitchen . Please check the file attached. Proposals due no later than April 15, 2026 at noon , All proposals can be emailed to Ritika Patel at rpatel@hopkintonma.gov. Questions can be emailed to andreu@hopkintonma.gov with cc to rpatel@hopkintonma.gov no later than, April 13, 2026 Noon.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Hopkinton is soliciting quotations for the supply and installation of a Southbend 60-inch range griddle in the kitchen of the Senior Center. Proposals must be submitted by April 15, 2026, highlighting the importance of comprehensive compliance with the outlined specifications. Interested bidders should ensure they address the questions by April 13, 2026, to clarify any uncertainties related to the project.
The buyer is seeking a qualified vendor to supply and install a specific 60-inch range griddle, ensuring it meets the needs of the Senior Center kitchen.
- Companies with experience in kitchen equipment supply and installation
- Vendors who have previously worked with municipalities
- Businesses that specialize in commercial kitchen appliances
- Provide a quotation for the Southbend 60 inch range griddle
- Complete installation in the Senior Center kitchen
- Meet all specified installation requirements as per project attachment
- Written quotation detailing costs
- Installation plan and timeline
- Company credentials and previous project references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local regulations for commercial kitchen installations
- Proposals must include detailed specifications of the equipment offered
- Consider competitive pricing based on similar municipal contracts
- Include detailed breakdown of costs for transparency
- Partner with subcontractors who specialize in commercial kitchen installations if necessary
- Explore teaming agreements with vendors who provide complementary kitchen equipment
- Potential delays in equipment supply due to lead times
- Installation difficulties based on facility constraints
- Changes in municipal regulations impacting installation criteria
- What specific installation requirements are outlined in the attached document?
- Are there preferred brands or additional equipment needed alongside the griddle?
- What is the budget range for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications of installation requirements
- Budget for the project
- List of qualifications or certifications required for bidders
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.