Skip to content
Town of Holliston

Flagg Field Recreation Construction

Solicitation: Not available
Notice ID: ma_commbuys_d077abc773ca74ca14e8
NAICS UNSPSC 72-14-13DepartmentTown of HollistonAgencyHOLLPARK - Park and RecStateMAPostedDueMar 27, 2026, 11:00 AM UTCCloses in 24 days

Federal opportunity from HOLLPARK - Park and Rec • Town of Holliston. Place of performance: MA. Response deadline: Mar 27, 2026. Industry: NAICS UNSPSC 72-14-13.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,980,125,018
Sector total $2,980,125,018 • Share 100.0%
Live
Median
$158,160
P10–P90
$32,032$3,760,041
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,980,125,018)
Deal sizing
$158,160 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Travis Ahern 703 Washington Street Holliston, MA 01746 US Email: ahernt@holliston.k12.ma.us Phone: (508) 429-0608 FAX: (508) 429-0642
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Town of Holliston
Agency
HOLLPARK - Park and Rec
Subagency
HOLLPARK - Park and Rec
Office
Chris Meo
Contracting Office Address
Not available

More in NAICS UNSPSC 72-14-13

Description

Flagg Field Recreation Construction

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.