Skip to content
Town of Holliston

Gretchen/Andrews Lane Sidewalk-Roadway Improvements

Solicitation: Not available
Notice ID: ma_commbuys_87705ea7fcabe6e94add
NAICS 72, 14, 10DepartmentTown of HollistonAgencyDpwholl - DpwStateMAPostedDueFeb 18, 2026, 10:00 AM UTCExpired

Federal opportunity from DPWHOLL - DPW • Town of Holliston. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$6,934,604,320
Sector total $6,934,604,320 • Share 100.0%
Live
Median
$206,573
P10–P90
$30,957$1,243,935
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($6,934,604,320)
Deal sizing
$206,573 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Travis Ahern 703 Washington Street Holliston, MA 01746 US Email: ahernt@holliston.k12.ma.us Phone: (508) 429-0608 FAX: (508) 429-0642
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Holliston
Agency
DPWHOLL - DPW
Subagency
DPWHOLL - DPW
Office
Chris Meo
Contracting Office Address
Not available

Description

Gretchen/Andrews Lane Sidewalk-Roadway Improvements

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The DPW is seeking contractors for the Gretchen/Andrews Lane Sidewalk-Roadway Improvements project, with a response deadline set for February 18, 2026. This project falls under the UNSPSC 72-14-10 classification related to construction and public infrastructure improvements. Interested bidders should carefully review the provided attachments for detailed project requirements and specifications.

Sidewalk improvementsRoadway constructionInfrastructure enhancementPublic safetyCivil engineering
What the buyer is trying to do

The DPW aims to enhance pedestrian safety and improve traffic flow through the upgrades of sidewalks and roadways on Gretchen and Andrews Lane.

Who should pursue this
  • Civil engineering firms
  • Construction contractors with experience in roadway and sidewalk projects
  • Companies familiar with local infrastructure regulations
Work breakdown
  • Assessment and planning of existing sidewalk and roadway conditions
  • Design and engineering of improvement plans
  • Procurement of materials and labor
  • Construction and installation of updated sidewalks and roadway features
  • Quality assurance and project completion checks
Response package checklist
  • Completed proposal form based on attachment details
  • Proof of relevant experience and past projects
  • Project timeline and pricing structure
  • Team bio of key personnel involved in the project
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local regulations and safety standards
  • All materials used must meet state-approved specifications
Pricing strategy
  • Competitive pricing while ensuring quality materials and skilled labor
  • Consider potential cost overruns during project execution
Teaming and subs
  • Subcontracting opportunities for specialized areas such as drainage or landscaping
  • Partnering with local engineering firms to enhance proposal credibility
Risks and watchouts
  • Potential delays due to unforeseen environmental regulations
  • Challenges in coordinating with local traffic management during construction
Smart questions to ask
  • Are there specific design guidelines we must follow?
  • What is the expected traffic management plan during construction?
  • Will there be any community engagement requirements?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work not provided
  • Specific budget range or estimated cost
  • Information on existing infrastructure conditions
  • Local permitting requirements
  • Community feedback or constraints related to the project

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.