Town Hall Exterior Restoration Project
Federal opportunity from HOLDN - Town of Holden • Town of Holden. Place of performance: MA. Response deadline: Mar 09, 2026. Industry: NAICS 72, 10, 24.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
General Project Information: The project consists of the demolition of the existing concrete ramp, stair and guard & handrail system, exterior siding and trim repair and preparation for new painting. Construction of a new concrete ramp and stair and the installation of new guard and handrail system. The painting of the entire exterior façade, with alternates for HVAC and granite step repair.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town Hall Exterior Restoration Project by the Town of Holden focuses on significant renovations including the demolition of the existing structure and the installation of a new concrete ramp and stair. The project also entails siding and trim repairs, with a complete repainting of the exterior façade. Interested bidders should note that alternates may involve HVAC and granite step repairs, enhancing the potential complexity of submitted proposals.
The buyer aims to restore and update the exterior of the Town Hall by replacing outdated elements, ensuring safety features like new guardrails, and enhancing aesthetic appeal through painting and repairs.
- Contractors with experience in exterior restoration projects
- Companies specializing in concrete work and painting
- Vendors familiar with municipal project requirements
- Demolition of existing concrete ramp and stair system
- Repairing and preparing exterior siding and trim
- Constructing new concrete ramp and stair system
- Installing new guard and handrail system
- Painting the entire exterior façade
- Alternates for HVAC and granite step repair
- Completed bid proposal form
- Detailed project timeline
- Itemized cost estimate
- Qualifications and experience summary
- References from similar projects
- Proof of insurance and bonding
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local building codes
- Follow safety regulations during demolition and construction
- Adhere to municipal contracting standards
- Consider itemizing costs for transparency
- Include contingencies for potential changes in scope
- Evaluate local labor rates to remain competitive
- Consider partnering with local subcontractors for specialized work
- Engage suppliers for quality materials at competitive prices
- Look for opportunities to include minority-owned businesses as subs
- Weather delays impacting construction timeline
- Potential unforeseen issues during demolition
- Budget overruns from scope changes
- What specific materials and finishes are preferred?
- Are there any existing structural issues to be aware of?
- What is the anticipated timeline for project completion?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed timeline for project phases
- Information on existing structural conditions
- Additional requirements for HVAC and granite repairs
- Clarification on permitting processes
- Exact location for project execution
- Specifications for paint and materials to be used
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.