Skip to content
Town of Hatfield

Installation of Backup Generator at Ferry Road Pump Station

Solicitation: Not available
Notice ID: ma_commbuys_860f9f507bccdfd07172
NAICS 26, 11, 16DepartmentTown of HatfieldAgencyTA123 - Town of HatfieldStateMAPostedDueApr 01, 2026, 01:00 PM UTCExpired

Federal opportunity from TA123 - Town of Hatfield • Town of Hatfield. Place of performance: MA. Response deadline: Apr 01, 2026. Industry: NAICS 26, 11, 16.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,717,892,559
Sector total $2,717,892,559 • Share 100.0%
Live
Median
$324,687
P10–P90
$42,300$2,156,671
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,717,892,559)
Deal sizing
$324,687 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Marlene Michonski 59 Main Street Hatfield, MA 01038 US Email: townadministrator@townofhatfield.org Phone: (413) 247-9200 Ext. 100 FAX: (413) 247-5029
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260023 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Hatfield
Agency
TA123 - Town of Hatfield
Subagency
TA123 - Town of Hatfield
Office
Marlene Michonski
Contracting Office Address
Not available

Description

The Base Bid work consists of installation of a backup generator system and automatic transfer switch at the Ferry Road Pump Station, site restoration and pavement repair. The work is estimated to cost $475,000. Additive Alternate No. 1 work consists of installation of a backup generator system and automatic transfer switch at the King Street Pump Station.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Hatfield is soliciting bids for the installation of a backup generator system at the Ferry Road Pump Station, with a total estimated cost of $475,000. Bidders will also have the option to present a proposal for additional work at the King Street Pump Station. This opportunity is crucial for ensuring reliable operations of the pump stations, enhancing the town's infrastructure resilience.

generator installationpump stationbackup power systemmunicipal infrastructuresite restoration
What the buyer is trying to do

The buyer aims to procure a contractor for the installation of backup generator systems, ensuring uninterrupted service at critical infrastructure sites.

Who should pursue this
  • Electrical contractors experienced in generator installations
  • General contractors with a history of municipal projects
  • Companies with a proven track record in site restoration and infrastructure work
Work breakdown
  • Installation of backup generator system
  • Installation of automatic transfer switch
  • Site restoration
  • Pavement repair
  • Additive Alternate No. 1 for King Street Pump Station
Response package checklist
  • Completed bid proposal forms
  • Proof of relevant licenses and certifications
  • References for similar projects
  • Detailed project timeline
  • Pricing breakdown for base and additive alternate work
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local regulations for electrical installations
  • Adhere to safety standards during installation
Pricing strategy
  • Consider the fixed budget of $475,000 for base bid work
  • Include separate pricing for Additive Alternate No. 1 to allow flexibility in bidding
Teaming and subs
  • Elect to partner with local electrical firms for insights on compliance and regulations
  • Possibly team with civil contractors for site restoration needs
Risks and watchouts
  • Potential delays due to unforeseen site conditions
  • Compliance with municipal codes can affect project timelines
  • Bid competition may drive prices lower than sustainable for quality work
Smart questions to ask
  • What are the specific timeline expectations post-bid award?
  • Are there any local regulations that may impact installation timelines?
  • What are the approval processes for the different stages of installation?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific start and end dates for the project are not provided
  • Details on warranty or maintenance requirements are unclear
  • Information on expected contractor qualifications and certifications is missing
  • No information on site access or restrictions during installation
  • No details on potential local incentives for infrastructure improvements

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.