Installation of Backup Generator at Ferry Road Pump Station
Federal opportunity from TA123 - Town of Hatfield • Town of Hatfield. Place of performance: MA. Response deadline: Apr 01, 2026. Industry: NAICS 26, 11, 16.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
The Base Bid work consists of installation of a backup generator system and automatic transfer switch at the Ferry Road Pump Station, site restoration and pavement repair. The work is estimated to cost $475,000. Additive Alternate No. 1 work consists of installation of a backup generator system and automatic transfer switch at the King Street Pump Station.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Hatfield is soliciting bids for the installation of a backup generator system at the Ferry Road Pump Station, with a total estimated cost of $475,000. Bidders will also have the option to present a proposal for additional work at the King Street Pump Station. This opportunity is crucial for ensuring reliable operations of the pump stations, enhancing the town's infrastructure resilience.
The buyer aims to procure a contractor for the installation of backup generator systems, ensuring uninterrupted service at critical infrastructure sites.
- Electrical contractors experienced in generator installations
- General contractors with a history of municipal projects
- Companies with a proven track record in site restoration and infrastructure work
- Installation of backup generator system
- Installation of automatic transfer switch
- Site restoration
- Pavement repair
- Additive Alternate No. 1 for King Street Pump Station
- Completed bid proposal forms
- Proof of relevant licenses and certifications
- References for similar projects
- Detailed project timeline
- Pricing breakdown for base and additive alternate work
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local regulations for electrical installations
- Adhere to safety standards during installation
- Consider the fixed budget of $475,000 for base bid work
- Include separate pricing for Additive Alternate No. 1 to allow flexibility in bidding
- Elect to partner with local electrical firms for insights on compliance and regulations
- Possibly team with civil contractors for site restoration needs
- Potential delays due to unforeseen site conditions
- Compliance with municipal codes can affect project timelines
- Bid competition may drive prices lower than sustainable for quality work
- What are the specific timeline expectations post-bid award?
- Are there any local regulations that may impact installation timelines?
- What are the approval processes for the different stages of installation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific start and end dates for the project are not provided
- Details on warranty or maintenance requirements are unclear
- Information on expected contractor qualifications and certifications is missing
- No information on site access or restrictions during installation
- No details on potential local incentives for infrastructure improvements
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.