Skip to content
Town of Hampden

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT OF BRIDGE NO. H-04-007 (5MP) SOUTH ROAD OVER BALLARD BROO

Solicitation: Not available
Notice ID: ma_commbuys_5885cc528a50b31047f0
NAICS 72, 14, 11DepartmentTown of HampdenAgencyTOWNH - Town HallStateMAPostedDueMar 05, 2026, 10:00 AM UTCExpired

Federal opportunity from TOWNH - Town Hall • Town of Hampden. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS 72, 14, 11.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Live POP
Place of performance
TOWNH - Town Hall
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260023 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Hampden
Agency
TOWNH - Town Hall
Subagency
TOWNH - Town Hall
Office
Brian Domina
Contracting Office Address
Not available

Description

The work under this contract consists of demolition of the existing bridge superstructure and bridge railings, modification of the existing bridge seats, backwalls, and wingwall copings, installation of adjacent precast concrete deck beams, construction of a reinforced concrete topping slab and safety curbs, installation of steel thrie beam bridge railing and approach guardrail, paving over the bridge and on the roadway approaches. Email townadmin@hampdenma.gov for bid documents.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 18, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town Hall of Hampden is seeking bids for the proposed replacement of Bridge No. H-04-007, focusing on demolishing the current superstructure and installing new precast concrete components. The response deadline is set for March 5, 2026, offering bidders ample time to prepare. Key activities include modifying existing structural elements and ensuring the safety and functionality of the bridge post-construction.

bridge replacementsuperstructure demolitionprecast concrete installationsafety curbsbridge railingconstruction bid
What the buyer is trying to do

The Town seeks to replace the superstructure of Bridge No. H-04-007 to enhance safety and ensure structural integrity. This project includes demolition, construction, and installation of various components critical to bridge functionality.

Who should pursue this
  • General Contractors specializing in bridge construction
  • Civil engineering firms with experience in structural modifications
  • Companies experienced in precast concrete installation
Work breakdown
  • Demolition of existing bridge superstructure
  • Modification of bridge seats, backwalls, and wingwall copings
  • Installation of precast concrete deck beams
  • Construction of reinforced concrete topping slab and safety curbs
  • Installation of steel thrie beam bridge railing
  • Paving of bridge and roadway approaches
Response package checklist
  • Company profile and relevant experience
  • Detailed project timeline and milestones
  • Pricing strategy outlines and cost estimates
  • Safety and compliance certifications
  • Proposed team members and their qualifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bidders must adhere to safety regulations for bridge construction
  • All work must comply with local building codes
Pricing strategy
  • Consider fixed pricing due to the defined scope of work outlined in the bid
  • Include contingencies for potential unforeseen site conditions
Teaming and subs
  • Consider partnering with structural engineering firms for design support
  • Engage local subcontractors for specialized tasks like paving
Risks and watchouts
  • Delays in demolition may impact schedule
  • Potential environmental regulations concerning nearby waterways
Smart questions to ask
  • What is the expected timeline for permitting and final approval?
  • Are there specific environmental considerations that bidders should be aware of?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget range provided
  • No details on existing bridge conditions
  • Lack of information on required permits
  • No exact specifications for materials to be used
  • Limited details on site access or logistical challenges

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.