PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT OF BRIDGE NO. H-04-007 (5MP) SOUTH ROAD OVER BALLARD BROO
Federal opportunity from TOWNH - Town Hall • Town of Hampden. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS 72, 14, 11.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
The work under this contract consists of demolition of the existing bridge superstructure and bridge railings, modification of the existing bridge seats, backwalls, and wingwall copings, installation of adjacent precast concrete deck beams, construction of a reinforced concrete topping slab and safety curbs, installation of steel thrie beam bridge railing and approach guardrail, paving over the bridge and on the roadway approaches. Email townadmin@hampdenma.gov for bid documents.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town Hall of Hampden is seeking bids for the proposed replacement of Bridge No. H-04-007, focusing on demolishing the current superstructure and installing new precast concrete components. The response deadline is set for March 5, 2026, offering bidders ample time to prepare. Key activities include modifying existing structural elements and ensuring the safety and functionality of the bridge post-construction.
The Town seeks to replace the superstructure of Bridge No. H-04-007 to enhance safety and ensure structural integrity. This project includes demolition, construction, and installation of various components critical to bridge functionality.
- General Contractors specializing in bridge construction
- Civil engineering firms with experience in structural modifications
- Companies experienced in precast concrete installation
- Demolition of existing bridge superstructure
- Modification of bridge seats, backwalls, and wingwall copings
- Installation of precast concrete deck beams
- Construction of reinforced concrete topping slab and safety curbs
- Installation of steel thrie beam bridge railing
- Paving of bridge and roadway approaches
- Company profile and relevant experience
- Detailed project timeline and milestones
- Pricing strategy outlines and cost estimates
- Safety and compliance certifications
- Proposed team members and their qualifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bidders must adhere to safety regulations for bridge construction
- All work must comply with local building codes
- Consider fixed pricing due to the defined scope of work outlined in the bid
- Include contingencies for potential unforeseen site conditions
- Consider partnering with structural engineering firms for design support
- Engage local subcontractors for specialized tasks like paving
- Delays in demolition may impact schedule
- Potential environmental regulations concerning nearby waterways
- What is the expected timeline for permitting and final approval?
- Are there specific environmental considerations that bidders should be aware of?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific budget range provided
- No details on existing bridge conditions
- Lack of information on required permits
- No exact specifications for materials to be used
- Limited details on site access or logistical challenges
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.