Skip to content
Town of Groton

Improvement of Cow Pond Brook Field

Solicitation: Not available
Notice ID: ma_commbuys_442b59c3ef60a1a82d7d
NAICS 30, 12, 00DepartmentTown of GrotonAgencyTGR001 - Town of GrotonStateMAPostedDueApr 16, 2026, 12:00 PM UTCCloses in 5 days

Federal opportunity from TGR001 - Town of Groton • Town of Groton. Place of performance: MA. Response deadline: Apr 16, 2026. Industry: NAICS 30, 12, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,212,353,333
Sector total $7,212,353,333 • Share 100.0%
Live
Median
$233,223
P10–P90
$30,957$1,295,712
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,212,353,333)
Deal sizing
$233,223 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Mark Haddad 173 Main Street Unit 204 MA Groton, MA 01450 US Email: mhaddad@townofgroton.org Phone: (978) 448-1111 FAX: (978) 448-1115
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Groton
Agency
TGR001 - Town of Groton
Subagency
TGR001 - Town of Groton
Office
Mark Haddad
Contracting Office Address
Not available

Description

The Town of Groton requests sealed bid proposals from qualified contractors for the â??Improvements at Cow Pond Brook Fieldsâ?? located at 599 Cow Pond Brook Road, Groton, MA. Work will include construction of a new youth baseball field, athletic lighting, playground area, accessible pathways, new parking lot and associated sidewalks, parking lot lighting, fencing, naturalized restoration work, and other site landscape and hardscape improvements.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 30, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Groton is soliciting sealed bids for the Improvements at Cow Pond Brook Fields, due by April 16, 2026. This project involves constructing a new youth baseball field, installing athletic lighting, and developing pathways and landscaping enhancements. Contractors need to be qualified in site development and landscaping to compete effectively in this opportunity.

youth baseball fieldathletic lightingsite improvementslandscapingaccessible pathways
What the buyer is trying to do

The Town of Groton aims to enhance Cow Pond Brook Fields by adding recreational facilities, improving accessibility, and upgrading site infrastructure to support community activities.

Who should pursue this
  • General contractors experienced in site development
  • Landscaping contractors
  • Specialists in athletic field construction
Work breakdown
  • Construct a new youth baseball field
  • Install athletic lighting
  • Develop playground area and accessible pathways
  • Build a new parking lot and associated sidewalks
  • Install parking lot lighting
  • Construct fencing
  • Perform naturalized restoration work
  • Implement site landscape and hardscape improvements
Response package checklist
  • Completed Bid Proposal Form
  • Qualifications and Experience Documentation
  • Detailed Project Timeline
  • Pricing Breakdown
  • Safety and Compliance Information
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adhere to local building codes and regulations
  • Ensure all materials meet quality standards
Pricing strategy
  • Consider competitive pricing while ensuring coverage of all projected costs
  • Include contingencies for unexpected site conditions
Teaming and subs
  • Collaborate with landscaping specialists for aesthetic enhancements
  • Consider partnering with local subcontractors for site preparation and utility work
Risks and watchouts
  • Potential delays in permitting processes
  • Weather-related impacts on construction timelines
  • Budget overruns due to unforeseen site conditions
Smart questions to ask
  • What specific qualifications are needed to be considered a qualified contractor?
  • Are there preferred vendors or materials for the lighting and playground installations?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific procurement solicitation number provided
  • Initial phase start date is missing
  • Information on prevailing wage requirements not included
  • Details regarding site-specific regulations are unknown
  • No contact information for the buyer is available

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.