Skip to content
Town of Duxbury

Landing Road Sewer Force Main Repair Project

Solicitation: Not available
Notice ID: ma_commbuys_561fd7f5ce9f5f266ed1
NAICS 72, 13, 00DepartmentTown of DuxburyAgencyDUX03 - Department of Public WorksStateMAPostedDueApr 15, 2026, 04:00 PM UTCCloses in 6 days

Federal opportunity from DUX03 - Department of Public Works • Town of Duxbury. Place of performance: MA. Response deadline: Apr 15, 2026. Industry: NAICS 72, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,206,283,725
Sector total $7,206,283,725 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,015,226
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,206,283,725)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Mr. Rene J. Read 878 Tremont Street Duxbury, MA 02332 US Email: Rene@town.duxbury.ma.us Phone: (781) 934-1100 FAX: (781) 934-9011
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260004 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Berkshire, Bristol +8
Rate
Bricklayer, Plasterer, Stonemason
Base $62.40Fringe $34.40
Rate
Bricklayer, Plasterers, Stonemasons, Tile Layers
Base $50.81Fringe $32.27
+44 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 44 more rate previews.
Davis-BaconBest fitstate match
MA20260004 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Berkshire, Bristol +8
Rate
Bricklayer, Plasterer, Stonemason
Base $62.40Fringe $34.40
Rate
Bricklayer, Plasterers, Stonemasons, Tile Layers
Base $50.81Fringe $32.27
Rate
BRICKLAYER
Base $62.40Fringe $34.40
+43 more occupation rates in this WD
Davis-Baconstate match
MA20260018 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Essex
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Duxbury
Agency
DUX03 - Department of Public Works
Subagency
DUX03 - Department of Public Works
Office
Angela Ball
Contracting Office Address
Not available

Description

Landing Road Sewer Force Main Repair Project, located at Landing Road at Surfside West, Duxbury, MA. The work includes replacement of two (2) 4-inch transition couplings for a sewer force main, excavation around an existing sewer manhole, pipe cutting and reconnection using Town-supplied materials, observation of repairs, and associated labor and equipment

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 03, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

DUX03 - Department of Public Works issued solicitation Landing Road Sewer Force Main Repair Project, with NAICS 72, 13, 00. Landing Road Sewer Force Main Repair Project, located at Landing Road at Surfside West, Duxbury, MA. The work includes replacement of two (2) 4-inch transition couplings for a sewer force main, excavation around an existing sewer manhole, pipe cutting and reconnection using Town-supplied materials, observation of repairs, and associated labor and equipment

Landing Road Sewer Force Main Repair ProjectDUX03 - Department of Public Works721300
What the buyer is trying to do

Landing Road Sewer Force Main Repair Project, located at Landing Road at Surfside West, Duxbury, MA. The work includes replacement of two (2) 4-inch transition couplings for a sewer force main, excavation around an existing sewer manhole, pipe cutting and reconnection using Town-supplied materials, observation of repairs, and associated labor and equipment

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
  • Teams aligned to NAICS 72, 13, 00.
Work breakdown
  • Landing Road Sewer Force Main Repair Project
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Notice aligns to NAICS 72, 13, 00.
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is Apr 15, 2026; verify exact due time and timezone.
  • Attachment coverage is limited in the current record; check the source portal directly.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.