Skip to content
Town of Clarksburg

Cyclical Data Verification of Real Property

Solicitation: Not available
Notice ID: ma_commbuys_0293b940b40028ed3a7d
NAICS 80, 13, 00DepartmentTown of ClarksburgAgencyADM11 - AdministratorStateMAPostedDueMay 05, 2026, 03:00 PM UTCCloses in 24 days

Federal opportunity from ADM11 - Administrator • Town of Clarksburg. Place of performance: MA. Response deadline: May 05, 2026. Industry: NAICS 80, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,212,353,333
Sector total $7,212,353,333 • Share 100.0%
Live
Median
$233,223
P10–P90
$30,957$1,295,712
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,212,353,333)
Deal sizing
$233,223 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Ron Boucher 111 River Road Clarksburg, MA 01247 US Email: townadministrator@clarksburgma.gov Phone: (413) 663-8250 FAX: (413) 664-6575
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Clarksburg
Agency
ADM11 - Administrator
Subagency
ADM11 - Administrator
Office
Ron Boucher
Contracting Office Address
Not available

Description

Bidders are to submit responses based upon the specifications as outlined within Attachment A.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 03, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

ADM11 - Administrator issued solicitation Cyclical Data Verification of Real Property, with NAICS 80, 13, 00. Bidders are to submit responses based upon the specifications as outlined within Attachment A. Review the linked source materials to confirm final scope, submission mechanics, and buyer instructions.

Cyclical Data Verification of Real PropertyADM11 - Administrator801300
What the buyer is trying to do

Bidders are to submit responses based upon the specifications as outlined within Attachment A.

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
  • Teams aligned to NAICS 80, 13, 00.
Work breakdown
  • Cyclical Data Verification of Real Property
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Notice aligns to NAICS 80, 13, 00.
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is May 5, 2026; verify exact due time and timezone.
  • Attachment coverage is limited in the current record; check the source portal directly.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.