Skip to content
Town of Chelmsford

South Row Kitchen Hood Installation

Solicitation: Not available
Notice ID: ma_commbuys_4388c98eec16983852dc
NAICS 72, 13DepartmentTown of ChelmsfordAgency6931 - SchoolStateMAPostedDueFeb 26, 2026, 03:00 PM UTCExpired

Federal opportunity from 6931 - School • Town of Chelmsford. Place of performance: MA. Response deadline: Feb 26, 2026. Industry: NAICS 72, 13.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Joanna Johnson-Collins 230 North Rd. Chelmsford Public Schools Chelmsford, MA 01824 US Email: johnsoncollinsj@chelmsford.k12.ma.us Phone: (978) 251-5100 Ext. 6931 FAX: (978) 251-5110
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260023 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Chelmsford
Agency
6931 - School
Subagency
6931 - School
Office
Joanna Johnson-Collins
Contracting Office Address
Not available

Description

South Row Kitchen Hood Installation

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The South Row Kitchen Hood Installation project is an opportunity related to the School agency (ID: 6931) under the UNSPSC 72-13 category. This project will require interested bidders to prepare their proposals before the response deadline of February 26, 2026. Given the specific focus on kitchen ventilation systems, experience in commercial kitchen installations will be critical.

kitchen hood installationcommercial kitchenschool ventilation systems
What the buyer is trying to do

The buyer is seeking qualified contractors to install kitchen hoods at South Row, which likely entails ensuring compliance with safety and operational standards for school kitchens.

Who should pursue this
  • Contractors specializing in commercial kitchen installations
  • Firms with experience in school or institutional projects
  • Companies with prior project references in hood installation
Work breakdown
  • Site assessment and preparation
  • Installation of kitchen hoods
  • Compliance checks for safety standards
  • Final inspections and testing
Response package checklist
  • Company profile and relevant experience
  • Technical proposal outlining installation methodology
  • Cost proposal including itemized pricing
  • References from previous clients in similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local building codes and fire safety regulations
  • Equipment must meet health department standards
  • Proper certifications for kitchen equipment installations
Pricing strategy
  • Consider competitive pricing due to potential for multiple bidders
  • Factor in any necessary certifications or compliance costs
Teaming and subs
  • Subcontractors specializing in kitchen equipment
  • Partners with experience in mechanical installations
  • Local labor forces that understand school operation constraints
Risks and watchouts
  • Potential delays in procurement of kitchen equipment
  • Compliance challenges with health and safety regulations
  • Cost overruns due to unforeseen site conditions
Smart questions to ask
  • What is the existing infrastructure like at the installation site?
  • Are there specific health and safety guidelines we need to follow?
  • What are the expectations for project timelines and completion?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific installation site details
  • Scope of work beyond hood installation
  • Budget or funding source information
  • Contractor eligibility requirements
  • Any mandatory pre-bid meetings or site visits
  • Details on performance bonds or insurance requirements
  • Information on project milestones or interim deadlines
  • Selection criteria for bid evaluation

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.