South Row Kitchen Hood Installation
Federal opportunity from 6931 - School • Town of Chelmsford. Place of performance: MA. Response deadline: Feb 26, 2026. Industry: NAICS 72, 13.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
South Row Kitchen Hood Installation
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The South Row Kitchen Hood Installation project is an opportunity related to the School agency (ID: 6931) under the UNSPSC 72-13 category. This project will require interested bidders to prepare their proposals before the response deadline of February 26, 2026. Given the specific focus on kitchen ventilation systems, experience in commercial kitchen installations will be critical.
The buyer is seeking qualified contractors to install kitchen hoods at South Row, which likely entails ensuring compliance with safety and operational standards for school kitchens.
- Contractors specializing in commercial kitchen installations
- Firms with experience in school or institutional projects
- Companies with prior project references in hood installation
- Site assessment and preparation
- Installation of kitchen hoods
- Compliance checks for safety standards
- Final inspections and testing
- Company profile and relevant experience
- Technical proposal outlining installation methodology
- Cost proposal including itemized pricing
- References from previous clients in similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to local building codes and fire safety regulations
- Equipment must meet health department standards
- Proper certifications for kitchen equipment installations
- Consider competitive pricing due to potential for multiple bidders
- Factor in any necessary certifications or compliance costs
- Subcontractors specializing in kitchen equipment
- Partners with experience in mechanical installations
- Local labor forces that understand school operation constraints
- Potential delays in procurement of kitchen equipment
- Compliance challenges with health and safety regulations
- Cost overruns due to unforeseen site conditions
- What is the existing infrastructure like at the installation site?
- Are there specific health and safety guidelines we need to follow?
- What are the expectations for project timelines and completion?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific installation site details
- Scope of work beyond hood installation
- Budget or funding source information
- Contractor eligibility requirements
- Any mandatory pre-bid meetings or site visits
- Details on performance bonds or insurance requirements
- Information on project milestones or interim deadlines
- Selection criteria for bid evaluation
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.