Skip to content
Town of Chatham

Eldredge Public Library Site Master Plan Improvements

Solicitation: Not available
Notice ID: ma_commbuys_493be6d103f6f4cbaf04
NAICS 30, 12, 00DepartmentTown of ChathamAgencyTMS01 - Town Manager SecretaryStateMAPostedDueMar 04, 2026, 02:00 PM UTCExpired

Federal opportunity from TMS01 - Town Manager Secretary • Town of Chatham. Place of performance: MA. Response deadline: Mar 04, 2026. Industry: NAICS 30, 12, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,203,828,782
Sector total $7,203,828,782 • Share 100.0%
Live
Median
$96,677
P10–P90
$28,298$1,600,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,203,828,782)
Deal sizing
$96,677 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Shana Nealy 549 Main St Chatham, MA 02633 US Email: snealy@chatham-ma.gov Phone: (508) 945-105 Ext. 1
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Chatham
Agency
TMS01 - Town Manager Secretary
Subagency
TMS01 - Town Manager Secretary
Office
Shanna Nealy
Contracting Office Address
Not available

Description

The Town of Chatham is soliciting bids for the implementation of Site Master Plan Improvements at the Eldredge Public Library in Chatham, MA. The scope of improvements includes road, parking lot/sidewalk reconstruction, site re-grading, new concrete sidewalks, railings, lighting, wall construction and ADA access improvements.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Chatham is seeking bids for the implementation of site master plan improvements at the Eldredge Public Library, with a response deadline of March 4, 2026. The project encompasses significant enhancements, including road reconstruction, new concrete sidewalks, and ADA accessibility upgrades, which are essential for modernizing the facility. This is an opportunity for firms with experience in municipal infrastructure projects to participate in improving community facilities.

Eldredge Public LibrarySite Master PlanInfrastructure ImprovementsADA ComplianceConstruction Bid
What the buyer is trying to do

The buyer aims to improve the Eldredge Public Library's infrastructure to enhance accessibility and safety for patrons, as well as to modernize the library's facilities.

Who should pursue this
  • Construction firms specializing in public works
  • Engineering firms with site planning experience
  • General contractors with ADA compliance expertise
Work breakdown
  • Road reconstruction
  • Parking lot/sidewalk reconstruction
  • Site re-grading
  • New concrete sidewalks and railings
  • Installation of lighting
  • Wall construction
  • ADA access improvements
Response package checklist
  • Completed bid form
  • Company profile and capabilities
  • Experience and past project examples
  • Proposed timeline for completion
  • Cost proposal including detailed pricing
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local building codes
  • Adhere to ADA requirements for accessibility improvements
Pricing strategy
  • Consider detailed cost breakdown for transparency
  • Include contingency for unforeseen site conditions
Teaming and subs
  • Subcontracting electrical work for lighting installation
  • Partnering with a specialist for ADA compliance consultation
Risks and watchouts
  • Potential delays due to weather impacting construction timelines
  • Budget overruns from unforeseen site issues
  • Community feedback affecting project scope
Smart questions to ask
  • What is the timeline for the start of construction?
  • Are there existing utilities that may affect the project?
  • What community engagement has been done regarding these improvements?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget range for the project
  • Identity of competitors bidding
  • Details on community engagement related to the project
  • Any preliminary design documents
  • Potential grants or funding sources attached to the project

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.