Skip to content
Town of Burlington

Memorial School Emergency Generator Replacement for Burlington Public Schools

Solicitation: Not available
Notice ID: ma_commbuys_8e00ed96d80a612b1073
NAICS 26, 11, 16DepartmentTown of BurlingtonAgencyBTV28 - Business OfficeStateMAPostedDueApr 01, 2026, 01:00 PM UTCExpired

Federal opportunity from BTV28 - Business Office • Town of Burlington. Place of performance: MA. Response deadline: Apr 01, 2026. Industry: NAICS 26, 11, 16.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,212,353,333
Sector total $7,212,353,333 • Share 100.0%
Live
Median
$233,223
P10–P90
$30,957$1,295,712
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,212,353,333)
Deal sizing
$233,223 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Nichole Cosica 123 Cambridge Street Business Office Burlington, MA 01803 US Email: ncoscia@bpsk12.org Phone: (781) 270-1798
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Burlington
Agency
BTV28 - Business Office
Subagency
BTV28 - Business Office
Office
Nichole Coscia
Contracting Office Address
Not available

Description

Gas generator replacement for Memorial Elementary School in Burlington MA 01803. IFB may be obtained after March 18, 2026 @ 10AM at the following link on the Town's website; https://ma-burlington.civicplus.com/Bids.aspx Deadline to submit responses is April 1, 2026 at 1:00PM.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 30, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Burlington Public Schools are seeking bids for the replacement of the gas generator at Memorial Elementary School, with a response deadline set for April 1, 2026. Interested bidders can access the Invitation for Bids (IFB) starting March 18, 2026, at a designated link on the Town's website. This project is critical for ensuring safety and reliability in power supply for the school.

generator replacementemergency powerBurlington Public Schoolsconstruction bidgas generator
What the buyer is trying to do

The agency is looking to procure a gas generator replacement to enhance the emergency power capabilities of Memorial Elementary School.

Who should pursue this
  • Contractors with experience in gas generator installations
  • Vendors with a proven track record in school infrastructure projects
  • Companies licensed and insured for electrical work
Work breakdown
  • Project planning and coordination with the Burlington Public Schools
  • Removal of the existing gas generator
  • Installation of a new gas generator
  • Testing and commissioning of the installed generator
  • Training for school staff on generator operation
Response package checklist
  • Completed bid form
  • Technical proposal outlining generator specifications
  • Timeline for project completion
  • Evidence of past performance on similar projects
  • Detailed pricing breakdown
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local building codes and safety regulations
  • Verify that all equipment meets NFPA and NEC standards
Pricing strategy
  • Consider competitive pricing against local market rates
  • Factor in potential costs for removal and disposal of the old generator
Teaming and subs
  • Potential for teaming with electrical subcontractors for installation
  • Consider partnership with local firms for logistical support
Risks and watchouts
  • Potential for supply chain delays for generator components
  • Weather-related impacts during installation period
  • Strict adherence to the submission deadline to avoid disqualification
Smart questions to ask
  • What are the specific requirements for the generator capacity?
  • Are there any required certifications for installation personnel?
  • Will there be a pre-bid meeting for contractors to ask questions?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific cost estimate for the project is provided
  • Clarification on the type of generator required is missing
  • Information on site access logistics is not detailed
  • Lack of details regarding maintenance post-installation
  • No mention of warranty requirements for the generator
  • Absence of information on preferred brands or specifications
  • No clear communication on evaluation criteria for bids
  • Deadline for obtaining the IFB does not specify central location for bidders

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.