Skip to content
Town of Burlington

2026 Paving and Parking Lots

Solicitation: Not available
Notice ID: ma_commbuys_eb746e024a3a0339d7c5
NAICS 72, 12, 00DepartmentTown of BurlingtonAgencyBTV02 - EngineeringStateMAPostedDueApr 01, 2026, 10:00 AM UTCExpired

Federal opportunity from BTV02 - Engineering • Town of Burlington. Place of performance: MA. Response deadline: Apr 01, 2026. Industry: NAICS 72, 12, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,212,353,333
Sector total $7,212,353,333 • Share 100.0%
Live
Median
$233,223
P10–P90
$30,957$1,295,712
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,212,353,333)
Deal sizing
$233,223 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Engineering 25 Center St 2nd Floor Burlington, MA 01803 US Email: engineering@burlington.org Phone: (781) 270-1640
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Burlington
Agency
BTV02 - Engineering
Subagency
BTV02 - Engineering
Office
Rachel Leonardo
Contracting Office Address
Not available

Description

2026 Paving and Parking Lots

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 30, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2026 Paving and Parking Lots opportunity, posted by BTV02 - Engineering, seeks contractors for pavement and parking lot works. The response deadline is April 1, 2026. Interested bidders should review the provided attachments for detailed requirements and specifications.

PavingParking lotsCivil engineeringConstruction bidsContracting
What the buyer is trying to do

The buyer aims to solicit bids for the paving and parking lot projects scheduled for 2026, which may involve site preparation, material supply, and project execution.

Who should pursue this
  • Construction companies specializing in paving
  • Contractors with experience in civil engineering projects
  • Firms with a solid safety record and compliance history
Work breakdown
  • Site assessment and preparation
  • Material sourcing for paving
  • Execution of paving works
  • Quality control and assurance during the project
  • Final inspections and handover
Response package checklist
  • Company profile and experience
  • List of relevant past projects
  • Detailed pricing proposal
  • Evidence of safety standards and compliance
  • Qualifications of key personnel
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with local bidding regulations
  • Proof of insurance required
  • Adherence to safety standards is mandatory
Pricing strategy
  • Consider competitive pricing to attract bids
  • Factor in potential material costs and labor
  • Include contingency costs for unforeseen issues
Teaming and subs
  • Explore partnerships with smaller subcontractors for specialized tasks
  • Engage suppliers for bulk material purchasing to reduce costs
Risks and watchouts
  • Potential delays due to weather conditions
  • Risk of cost overruns due to material price fluctuations
  • Compliance risks with local regulations
Smart questions to ask
  • What specific materials are required for the paving?
  • Are there restrictions on working hours?
  • What is the anticipated timeline for project milestones?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific location of the projects
  • Budget range for the contract
  • Detailed scope of work
  • Evaluation criteria for bids
  • Project timeline and milestones

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.