FY26 003 Hen Cove
Federal opportunity from TADMIN - Town Administrator • Town of Bourne. Place of performance: MA. Response deadline: Mar 18, 2026. Industry: NAICS 72, 15, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 44 more rate previews.↓
Point of Contact
Agency & Office
Description
The work to be performed under this contract includes, but is not limited to all labor, supervision, materials, fuel and equipment necessary to improve the storm drainage at the area of Circuit Avenue, Saco Avenue, Park Street, and Wamsutta Avenue surrounding Hen Cove.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town Administrator is soliciting improvements to storm drainage systems surrounding Hen Cove, particularly in the areas of Circuit Avenue, Saco Avenue, Park Street, and Wamsutta Avenue. This contract requires comprehensive services including labor, supervision, materials, fuel, and equipment. Bids are due by March 18, 2026, presenting an open opportunity for contractors specializing in drainage infrastructure to participate.
The buyer aims to enhance storm drainage in designated areas to prevent flooding and improve water management.
- Companies with experience in civil engineering
- General contractors with drainage expertise
- Local contractors familiar with the area
- Assessment of current drainage conditions
- Design of drainage improvements
- Procurement of materials and equipment
- Labor for construction and installation
- Project management and supervision
- Final inspections and reporting
- Completed bid form
- Proof of relevant experience
- Detailed project timeline
- Cost estimate and pricing strategy
- Proposed materials and equipment list
- Insurance and bonding documentation
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- All materials must comply with environmental standards
- Safety regulations must be strictly adhered to during construction
- Consider competitive pricing given potential local bidders
- Include detailed breakdown of costs for transparency
- Consider partnering with local subcontractors for on-ground expertise
- Engage with suppliers for materials to ensure availability
- Potential environmental impact assessments may delay project
- Local regulations could influence project scope
- Weather conditions could affect construction timelines
- What specific environmental regulations must be followed?
- Are there existing drainage problems that must be prioritized?
- What is the budget range for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget range for project costs
- Any required permits or regulatory approvals
- Details on the current state of drainage systems
- Timeline for project milestones
- Information on payment terms and conditions
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.