LEGAL AD ONLY: FY26 VACUUM PUMP REPLACEMENT https://townofbarnstable.bonfirehub.com
Federal opportunity from PUR01 - Purchasing Division • Town of Barnstable. Place of performance: MA. Response deadline: Feb 25, 2026. Industry: NAICS 83, 10, 15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
LEGAL AD ONLY -FY26 VACUUM PUMP REPLACEMENT https://townofbarnstable.bonfirehub.com
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Barnstable is seeking proposals for the FY26 Vacuum Pump Replacement. This notice is specifically aimed at attracting bids for the procurement of vacuum pumps under the UNSPSC 83-10-15 classification. Interested vendors should prepare their responses by the deadline of February 25, 2026.
The buyer aims to replace existing vacuum pumps as part of their operational upgrades for FY26.
- Companies specializing in vacuum pump manufacturing
- Suppliers of industrial equipment
- Firms with experience in municipal contracts
- Review existing vacuum pump needs
- Prepare bid submission
- Submit proposal by deadline
- Technical proposal
- Pricing sheet
- Company qualifications
- References from past projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to municipal procurement laws
- Competitive pricing based on market rate for similar pumps
- Consider including maintenance options
- Potential collaboration with local distributors
- Involvement of engineering firms for technical support
- Potential delays in supply chain affecting delivery times
- Compliance with municipal specifications may require additional resources
- What specific models or specifications of vacuum pumps are preferred?
- Are there any existing contracts that will affect this procurement?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for the vacuum pumps
- Budget for the project
- Evaluation criteria for proposals
- Any pre-bid meeting information
- Specific compliance guidelines
- Current vacuum pump condition assessment
- Any requirements for service contracts post-installation
- Additional documentation or forms required for submission
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.