26-09 Fire Alarm Upgrades - Brackett Elementary School
Federal opportunity from ARL03 - Manager's Office • Town of Arlington. Place of performance: MA. Response deadline: Apr 23, 2026. Industry: NAICS 72, 15, 17.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
26-09 Fire Alarm Upgrades - Brackett Elementary School. Bid documents available via electronic download from www.arlingtonma.gov/purchasing.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves fire alarm upgrades at Brackett Elementary School, managed by the ARL03 - Manager's Office. The response deadline is April 23, 2026, providing a significant timeline for proposal preparation. Bid documents are available for electronic download, indicating a structured procurement process.
The buyer is looking for qualified contractors to provide fire alarm upgrades at Brackett Elementary School to enhance safety and compliance with current standards.
- Contractors with experience in fire alarm systems
- Previous contractors for school safety upgrades
- Firms with relevant licenses and certifications
- Review bid documents available for download
- Assess existing fire alarm systems at Brackett Elementary School
- Prepare a detailed proposal including pricing and timelines
- Submit proposal by the deadline of April 23, 2026
- Completed proposal document
- Evidence of relevant experience and qualifications
- Bid pricing breakdown
- Compliance with local safety regulations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with fire safety codes
- Provide documentation of certifications and licenses
- Adhere to submission guidelines outlined in the bid documents
- Consider competitive pricing based on local market rates
- Factor in potential costs for equipment and labor
- Include contingencies for unforeseen project complexities
- Potential partnerships with local subcontractors for installation roles
- Collaboration with suppliers for fire alarm components
- Delays in obtaining necessary permits can impact timelines
- Potential for scope changes during installation
- Market fluctuations affecting material costs
- What specific fire safety codes need to be adhered to?
- Are there preferred manufacturers for the fire alarm systems?
- Is there a budget range or cap for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific details on existing systems
- Lack of attachment URLs or additional project documentation
- Absence of milestone dates within project execution
- No local contact information for follow-up inquiries
- Unclear if there are specific materials to be utilized
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.