Fitzsimmons Arms Site Improvements
Federal opportunity from THA02 - Taunton Housing Authority • Taunton Housing Authority. Place of performance: MA. Response deadline: Apr 03, 2026. Industry: NAICS UNSPSC 72-13-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 98 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-13-00
Description
The Project consists of but not limited to: Removal and replacement of concrete and asphalt sidewalks and handicap ramps, installation of a new HMA driveway, granite curbing, concrete sidewalks, and concrete handicap ramps, drainage improvements, landscaping improvements, and all other associated site work as specified within the Contract Documents. THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.