Skip to content
Southeastern Regional Transit Authority

Mobile Battery Electric Bus (Level 3) Charger Circuit/Connection Installation

Solicitation: Not available
Notice ID: ma_commbuys_dcd2cec1fa563c7121af

Federal opportunity from SRTA - Southeastern Regional Transit Authority • Southeastern Regional Transit Authority. Place of performance: MA. Response deadline: Feb 16, 2026. Industry: NAICS 39, 12, 17.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,224,714,355
Sector total $7,224,714,355 • Share 100.0%
Live
Median
$252,161
P10–P90
$30,768$1,428,923
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,224,714,355)
Deal sizing
$252,161 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
SRTA Procurement 700 Pleasant Street Suite 530 New Bedford, MA 02740 US Email: procurement@srtabus.com Phone: (508) 997-6767 FAX: (508) 993-9196
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260004 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Berkshire, Bristol +8
Rate
Bricklayer, Plasterer, Stonemason
Base $62.40Fringe $34.40
Rate
Bricklayer, Plasterers, Stonemasons, Tile Layers
Base $50.81Fringe $32.27
+44 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 44 more rate previews.
Davis-BaconBest fitstate match
MA20260004 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Berkshire, Bristol +8
Rate
Bricklayer, Plasterer, Stonemason
Base $62.40Fringe $34.40
Rate
Bricklayer, Plasterers, Stonemasons, Tile Layers
Base $50.81Fringe $32.27
Rate
BRICKLAYER
Base $62.40Fringe $34.40
+43 more occupation rates in this WD
Davis-Baconstate match
MA20260022 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Norfolk
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Southeastern Regional Transit Authority
Agency
SRTA - Southeastern Regional Transit Authority
Subagency
SRTA - Southeastern Regional Transit Authority
Office
Corey Hebert
Contracting Office Address
Not available

Description

The Southeastern Regional Transit Authority (SRTA) is seeking quotes for the installation of one (1) dedicated 100AMP, 480V circuit / feeder to an exterior pin/sleeve receptacle to enable the operation of one (1) level 3 DCFC mobile electric bus charging unit at the New Bedford Maintenance Facility located at: 65 Potomska Street New Bedford, MA 02740 Site visits can be scheduled Monday-Friday between the hours of 9:00AM to 3:00PM. Please email chebert@srtabus.com for more information

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Southeastern Regional Transit Authority (SRTA) is soliciting quotes for the installation of a dedicated 100AMP, 480V circuit for a Level 3 DCFC mobile electric bus charger at their New Bedford Maintenance Facility. This project must be completed at the specified location which has strict site visit hours from Monday to Friday. The response deadline is set for February 16, 2026, providing ample time for bidders to prepare their proposals.

Mobile Electric Bus ChargerLevel 3 DCFCCircuit InstallationSRTA BidNew Bedford Maintenance Facility
What the buyer is trying to do

SRTA aims to enable the operation of a mobile electric bus charging unit by installing a dedicated circuit to support this infrastructure at their New Bedford Maintenance Facility.

Who should pursue this
  • Electrical contractors experienced in commercial circuit installation
  • Firms specializing in EV charging infrastructure
  • Local bidders familiar with Massachusetts regulations
Work breakdown
  • Schedule site visit between Monday and Friday, 9:00AM to 3:00PM
  • Install one (1) dedicated 100AMP, 480V circuit
  • Install an exterior pin/sleeve receptacle for the charging unit
  • Complete installation by the response deadline of February 16, 2026
Response package checklist
  • Completed bid form
  • Proof of relevant licenses and certifications
  • Detailed project timeline
  • Company profile and references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Compliance with local electrical codes is mandatory
  • Ensure permits are obtained as required by local authorities
Pricing strategy
  • Consider competitive pricing to attract the contract
  • Factor in costs of materials for high-capacity electrical infrastructure
Teaming and subs
  • Consider teaming with local electrical subcontractors
  • Subcontracting for specialized EV equipment suppliers may enhance the bid proposal
Risks and watchouts
  • Delays in obtaining necessary permits may impact the project timeframe
  • Supply chain issues could affect availability of materials
  • Underestimating installation complications could affect profitability
Smart questions to ask
  • What existing infrastructure is available at the New Bedford facility?
  • Are there specific environmental considerations to address during installation?
  • What are the penalties for late completion of the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for the Level 3 DCFC unit
  • Exact timeframe for project completion beyond response deadline
  • Information on potential site hazards during installation
  • Details on warranty requirements for installed equipment
  • Information on payment terms post-installation

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.