Trade Contractors
Federal opportunity from SSRSD - South Shore Vocational Technical High School • South Shore Regional School District. Place of performance: MA. Response deadline: Apr 15, 2026. Industry: NAICS 72, 15, 19, 32, 26, 30, 13.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
South Shore Regional Vocational Technical School District , through its School Building Committee, requests qualified and experienced DCAMM Certified Trade Contractors submit Statements of Qualifications for the South Shore Regional Vocational Technical High School Project. This RFQ is for the Main Bid Package. Please see attachments TAB for detail directions on completing RFQ.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The South Shore Regional Vocational Technical High School District is soliciting Statements of Qualifications from DCAMM Certified Trade Contractors for their Main Bid Package related to a significant construction project. The deadline for submissions is April 15, 2026, providing ample time for preparation. Contractors interested in this opportunity should review the specific requirements detailed in the attached documents.
The buyer is seeking qualified and experienced trade contractors to participate in the Main Bid Package for the South Shore Regional Vocational Technical High School Project, managed by the School Building Committee.
- DCAMM Certified Trade Contractors with experience in educational construction projects
- Contractors with a strong background in collaborative bidding environments
- Firms with previous experience in projects of similar scope and budget.
- Review project requirements and qualifications as outlined in the RFQ and attachments.
- Prepare and submit Statements of Qualifications for consideration.
- Coordinate with additional subcontractors if necessary for comprehensive bids.
- Comply with DCAMM certification and other regulatory requirements.
- Completed Statement of Qualifications form
- Evidence of DCAMM certification
- List of relevant project experience
- Financial stability documentation
- Team resumes and qualifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure all qualifications meet DCAMM standards.
- Verify that submission complies with RFQ directions as outlined in the attachments.
- Consider competitive pricing within the context of educational budgets.
- Be prepared to justify pricing based on experience and project complexity.
- Identify potential subcontractors with relevant expertise to strengthen the bid.
- Explore partnerships with firms that bring complementary skills or certifications.
- Risk of disqualification if requirements are not fully met.
- Potential competitive disadvantage if unable to provide comprehensive qualifications.
- Market conditions may affect contractor availability and pricing.
- What specific trades are required for the Main Bid Package?
- Can more detailed timelines be provided regarding project milestones?
- What are the criteria for assessing Statements of Qualifications?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact scope of work for the Main Bid Package is not detailed.
- No specific evaluation criteria for qualifications provided.
- Information on the total project budget is missing.
- Details regarding the construction timeline are absent.
- No information on performance bonds or insurance requirements is provided.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.