Skip to content
North Andover Housing Authority

FISH 196082

Solicitation: Not available
Notice ID: ma_commbuys_9b7dd14900df45fb8f87

Federal opportunity from 1222CONVD - North Andover Housing Authority • North Andover Housing Authority. Place of performance: MA. Response deadline: Feb 20, 2026. Industry: NAICS 72, 13, 15.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,216,052,645
Sector total $7,216,052,645 • Share 100.0%
Live
Median
$244,661
P10–P90
$30,957$1,422,150
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,216,052,645)
Deal sizing
$244,661 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Jeff Baxter 10 Wilson Street Chelmsford, MA 01824 US Email: jbaxter@chelmsfordha.com Phone: (978) 320-4030
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260025 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260025 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
North Andover Housing Authority
Agency
1222CONVD - North Andover Housing Authority
Subagency
1222CONVD - North Andover Housing Authority
Office
Sharon Smith
Contracting Office Address
Not available

Description

Provide and install a 30 kW diesel generator with 100 A automatic transfer switch

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The North Andover Housing Authority is seeking a contractor to provide and install a 30 kW diesel generator with a 100 A automatic transfer switch, as detailed in solicitation FISH 196082. The response deadline for submissions is set for February 20, 2026. This project represents a critical infrastructure upgrade for the housing authority, ensuring reliable power supply during outages.

diesel generator installationautomatic transfer switchNorth Andover Housing Authorityconstruction bidelectrical contracting
What the buyer is trying to do

The buyer aims to enhance the electrical reliability of their facilities with the installation of a diesel generator that can handle automatic transfer switching, thus improving operational continuity during power failures.

Who should pursue this
  • Companies with experience in generator installation
  • Contractors specializing in electrical systems
  • Firms with a strong safety record in installation projects
Work breakdown
  • Review solicitation documents and requirements
  • Design installation plan for the diesel generator
  • Procure necessary materials and equipment
  • Install the 30 kW diesel generator
  • Install the 100 A automatic transfer switch
  • Conduct system tests and commissioning
  • Provide training for maintenance staff on generator operation
Response package checklist
  • Completed proposal in response to the solicitation
  • Demonstration of past relevant experience
  • Detailed project timeline
  • Cost proposal including all labor and materials
  • Proof of relevant licenses and certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local and state regulations regarding electrical installations
  • All bidders must adhere to safety regulations during the installation process
Pricing strategy
  • Consider competitive pricing but ensure all costs are covered in the proposal
  • Include warranty and maintenance options in pricing to enhance bid attractiveness
Teaming and subs
  • Consider subcontracting specialists in generator installations
  • Identify partners with experience in electrical infrastructure for collaborative bidding
Risks and watchouts
  • Potential delays in material procurement especially for specialized equipment
  • Fluctuations in material costs leading to budget overruns
  • Regulatory changes impacting installation requirements
Smart questions to ask
  • What existing infrastructure will the generator connect to?
  • Are there specific compliance or safety standards the agency prefers?
  • What is the expected timeline for project completion beyond the submission deadline?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific safety standards required for installation
  • Details on existing electrical systems and load requirements
  • Geographic constraints for installation site
  • Information on maintenance expectations post-installation
  • Clarification on warranty requirements for the generator

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.