Skip to content
Norfolk Sheriff's Department

Braintree Public Safety Complex - Interior Renovations

Solicitation: Not available
Notice ID: ma_commbuys_c61aff490757050ff100
NAICS 72, 10, 15DepartmentNorfolk Sheriff's DepartmentAgencySDN001 - Norfolk Sheriff's OfficeStateMAPostedDueMar 02, 2026, 02:00 PM UTCExpired

Federal opportunity from SDN001 - Norfolk Sheriff's Office • Norfolk Sheriff's Department. Place of performance: MA. Response deadline: Mar 02, 2026. Industry: NAICS 72, 10, 15.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$6,804,760,537
Sector total $6,804,760,537 • Share 100.0%
Live
Median
$88,212
P10–P90
$28,176$752,632
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($6,804,760,537)
Deal sizing
$88,212 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Kristin Conley 200 West St Dedham, MA 02026 US Email: kconley@norfolksheriffma.org Phone: (781) 751-3316
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Norfolk Sheriff's Department
Agency
SDN001 - Norfolk Sheriff's Office
Subagency
SDN001 - Norfolk Sheriff's Office
Office
Kristin Conley
Contracting Office Address
Not available

Description

Information regarding this RFR can be obtained by visiting the NCSO website at www.norfolksheriff.com (public information tab - notice to contractors)

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 01, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Norfolk Sheriff's Office is seeking contractors for the interior renovations of the Braintree Public Safety Complex, with responses due by March 2, 2026. Contractors can find further details on the project by visiting the NCSO website. Interested bidders should refer to the provided attachment for specific requirements and guidelines.

Braintree Public Safety ComplexInterior renovationsNorfolk Sheriff's Officepublic facility renovation
What the buyer is trying to do

The buyer aims to renovate the interior of the Braintree Public Safety Complex to enhance its functionality and aesthetics for public safety operations.

Who should pursue this
  • General contractors with experience in public facility renovations
  • Specialists in safety facility refurbishments
  • Companies familiar with working under government contracts
Work breakdown
  • Assessment of existing conditions
  • Planning and design for renovations
  • Interior renovation construction work
  • Final inspections and quality assurance
Response package checklist
  • Completed bid form
  • Proof of relevant experience
  • Insurance documentation
  • Cost proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local building codes is mandatory
  • Contractors must have up-to-date licenses
Pricing strategy
  • Competitive pricing based on local market rates
  • Consideration of previous renovation projects for cost estimation
Teaming and subs
  • Subcontracting opportunities for specialized trades such as electrical and plumbing
  • Potential collaboration with local suppliers for materials
Risks and watchouts
  • Risk of unforeseen structural issues during renovation
  • Delays in material procurement due to market conditions
Smart questions to ask
  • What specific renovations are prioritized by the agency?
  • Are there any pre-bid meetings or site visits scheduled?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work is not available
  • Specific budget range is not disclosed
  • No information on pre-bid meetings or site visits
  • No queries or clarifications contact information provided
  • No indication of project timeline beyond response deadline

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.