NBHA # 009-2026 Heating Unit Replacement
Federal opportunity from MOD001 - Modernization • New Bedford Housing Authority. Place of performance: MA. Response deadline: Mar 25, 2026. Industry: NAICS UNSPSC 72-11-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-11-00
Description
The Project consists of: Demolition of existing gas-fired, cast iron boilers and selected accessories and the installation of new gas-fired condensing boilers and selected accessories. Selective demolition of existing lighting and providing new luminaires. Work within Buildings 31, 47 and 48 shall form the base bid.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The NBHA # 009-2026 Heating Unit Replacement project involves the demolition of existing gas-fired boilers and the installation of new gas-fired condensing boilers within Buildings 31, 47, and 48. Additionally, the project includes selective demolition of lighting systems and the provision of new luminaires. The proposal deadline is set for March 25, 2026, highlighting a potential need for strategic timing in bid preparation.
Replace outdated heating systems and improve lighting in specific buildings, thereby enhancing energy efficiency and reliability.
- Demolition of existing gas-fired boilers
- Installation of new gas-fired condensing boilers
- Selective demolition of existing lighting
- Installation of new luminaires in specified buildings
- Bid proposal
- Cost estimates
- Detailed timeline for project completion
- Evidence of relevant past performance
- Compliance with safety regulations
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on funding availability and project budget
- Specific timelines for project phases
- Details on existing infrastructure conditions
- Any required certifications for contractors
- Information on warranty requirements for installed systems
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.