Camera Equipment Replacement AMP 10 & 90
Federal opportunity from MOD001 - Modernization • New Bedford Housing Authority. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS UNSPSC 72-11-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-11-00
Description
The Project consists of but not limited to: Replacing Avigilon Cameras with new Avigilon Cloud based cameras at select locations. Installing and setup of cloud connectors at other locations.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The project entails replacing Avigilon cameras with new Avigilon Cloud-based cameras at selected locations. Additionally, it involves installing cloud connectors at various sites to ensure seamless connectivity. The response deadline for bids is set for March 5, 2026, offering ample time for preparation and planning.
The buyer is seeking to upgrade their existing camera systems to enhance surveillance capabilities through new cloud-based technology.
- Replace existing Avigilon cameras
- Install new Avigilon Cloud-based cameras
- Set up cloud connectors at specified locations
- Technical proposal detailing installation process
- Experience and past performance documentation
- Pricing strategy and lifecycle costs
- Compliance with specifications outlined in attachments
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific locations for camera replacement not detailed
- No information on existing system compatibility
- Lack of detailed technical specifications for new cameras
- Absence of budget constraints or funding information
- No indication of warranty or support terms for equipment
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.