Skip to content
Needham Housing Authority

Construction Management Services for 2209 Modernization of SeaBeds Way

Solicitation: Not available
Notice ID: ma_commbuys_4d13e8a0768b80ce060e
NAICS 72, 13, 00DepartmentNeedham Housing AuthorityAgencyNHA02 - MaintenanceStateMAPostedDueApr 24, 2026, 02:00 PM UTCCloses in 13 days

Federal opportunity from NHA02 - Maintenance • Needham Housing Authority. Place of performance: MA. Response deadline: Apr 24, 2026. Industry: NAICS 72, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Cheryl Gosmon 21 Highland circle Suite 10 Needham, MA 02494 US Email: cgosmon@needhamhousing.org Phone: (781) 444-3011 FAX: (781) 444-1089
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Needham Housing Authority
Agency
NHA02 - Maintenance
Subagency
NHA02 - Maintenance
Office
Cheryl Gosmon
Contracting Office Address
Not available

Description

Request for Proposal for Construction Management Services for the Modernization of Seabeds Way. The Cambridge Housing Authority, acting as Ownerâ??s Project Manager for the NHA Seabeds Way LLC co Needham Housing Authorityhereinafter, "Owner", is requesting proposals for Construction Management Services for Project 2209 Modernization of Seabeds Way, Needham MA. The Owner intends to award a Construction Manager with a Guaranteed Maximum Price contract for the Modernization of Seabeds Way.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 14, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Cambridge Housing Authority is seeking proposals for Construction Management Services for the Modernization of SeaBeds Way in Needham, MA, with a response deadline of April 24, 2026. This project, identified as Project 2209, will require a Construction Manager to operate under a Guaranteed Maximum Price contract. Bidders should be prepared to demonstrate their capability in managing similar modernization projects effectively.

Construction ManagementGuaranteed Maximum PriceResidential ModernizationNeedham MassachusettsProject 2209
What the buyer is trying to do

The Cambridge Housing Authority aims to award Construction Management Services to facilitate the modernization of SeaBeds Way, ensuring project delivery under a Guaranteed Maximum Price contract.

Who should pursue this
  • Construction management firms with experience in residential modernization
  • Firms familiar with Guaranteed Maximum Price contracts
  • Local firms based in or around Needham, MA
Work breakdown
  • Review and assess construction plans and specifications
  • Develop a project schedule and budget
  • Manage subcontractor bids and selections
  • Oversee construction execution and compliance
  • Conduct regular project status meetings and reporting
Response package checklist
  • Completed proposal form
  • Company profile and qualifications
  • Demonstrated experience on similar projects
  • Project management plan and timeline
  • References from previous clients
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All proposals must comply with local and state regulations regarding construction management.
  • Bidders must adhere to labor and environmental standards as set forth by Massachusetts law.
Pricing strategy
  • Proposals should clearly outline the Guaranteed Maximum Price and how it will be achieved.
  • Consideration should be given to potential cost overruns and project contingencies.
Teaming and subs
  • Consider teaming with local subcontractors to enhance local expertise and resources.
  • Explore partnerships with firms specializing in sustainable construction practices to enhance the project appeal.
Risks and watchouts
  • Potential delays in permitting and regulatory approvals
  • Unforeseen construction challenges that may affect budget
  • Market fluctuations in construction materials pricing
Smart questions to ask
  • What are the specific milestones for project deliverables?
  • Are there preferred subcontractors or vendors that need to be included?
  • What are the local environmental regulations that could affect construction?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of construction work
  • Specific budget range or financial limits
  • Information on previous projects by the Cambridge Housing Authority
  • Details on site conditions or existing challenges
  • Regulatory requirements specific to Needham, MA

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.