"Ch. 149 THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. Please re
Federal opportunity from MSCBA - Massachusetts State College Building Authority • Massachusetts State College Building Authority. Place of performance: MA. Response deadline: Feb 25, 2026. Industry: NAICS 72, 13, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
The Massachusetts State College Building Authority requests bids for the Company 6 Roof Replacement Project at the Massachusetts Maritime Academy. The project is the replacement of the built-up roof on Mass Maritime Company 6, with a single membrane PVC roof system.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Massachusetts State College Building Authority (MSCBA) is seeking bids for the Company 6 Roof Replacement Project at the Massachusetts Maritime Academy, which involves replacing the built-up roof with a single membrane PVC roof system. Bids must be electronically submitted as hard copy bids will not be accepted. The deadline for submissions is February 25, 2026, at 2:00 PM.
The buyer aims to solicit bids for a roofing project that ensures the successful replacement of an outdated roof system with a more modern and efficient single membrane PVC roof.
- Contractors specializing in roofing systems
- Companies with experience in commercial roofing projects
- Businesses familiar with environmental considerations in roofing installations
- Site assessment and preparation
- Removal of existing built-up roof
- Installation of new single membrane PVC roof system
- Post-installation inspection and quality assurance
- Company profile and qualifications
- Detailed project approach and schedule
- Cost proposal with a breakdown of materials and labor
- Proof of insurance and bonding capacity
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bids must be submitted electronically; hard copy bids will not be accepted
- All bidders must adhere to applicable building codes and safety regulations
- Compliance with environmental guidelines for roofing projects
- Consider competitive pricing strategies based on current market rates for roofing materials and labor
- Include a contingency in pricing for potential unforeseen issues during the roofing replacement
- Potential partnerships with local roofing material suppliers
- Consider subcontracting specialized labor for PVC installations
- Explore teaming with companies experienced in eco-friendly roofing solutions
- Potential delays due to weather conditions affecting roof installation
- Supply chain disruptions for roofing materials
- Bidders failing to comply with electronic submission requirements
- What is the expected timeline for project completion?
- Are there specific bonding or insurance requirements?
- What is the anticipated budget range for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific project budget is not disclosed
- Detailed timelines for each project phase are missing
- Lack of information on pre-bid meetings or site visits
- No specification on warranty requirements for the new roofing system
- Absence of previous roofing project performance metrics
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.