"Ch. 149 THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. Please re
Federal opportunity from MSCBA - Massachusetts State College Building Authority • Massachusetts State College Building Authority. Place of performance: MA. Response deadline: Feb 25, 2026. Industry: NAICS UNSPSC 72-13-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-13-00
Description
The Massachusetts State College Building Authority requests bids for the Company 6 Roof Replacement Project at the Massachusetts Maritime Academy. The project is the replacement of the built-up roof on Mass Maritime Company 6, with a single membrane PVC roof system.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Massachusetts State College Building Authority (MSCBA) is seeking bids for the Company 6 Roof Replacement Project at the Massachusetts Maritime Academy, which involves replacing the built-up roof with a single membrane PVC roof system. Bids must be electronically submitted as hard copy bids will not be accepted. The deadline for submissions is February 25, 2026, at 2:00 PM.
The buyer aims to solicit bids for a roofing project that ensures the successful replacement of an outdated roof system with a more modern and efficient single membrane PVC roof.
- Site assessment and preparation
- Removal of existing built-up roof
- Installation of new single membrane PVC roof system
- Post-installation inspection and quality assurance
- Company profile and qualifications
- Detailed project approach and schedule
- Cost proposal with a breakdown of materials and labor
- Proof of insurance and bonding capacity
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific project budget is not disclosed
- Detailed timelines for each project phase are missing
- Lack of information on pre-bid meetings or site visits
- No specification on warranty requirements for the new roofing system
- Absence of previous roofing project performance metrics
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.