L1854-C1, FACILITIES REFRESH, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS
Federal opportunity from CAPPROG - Capital Programs • Massachusetts Port Authority (Massport). Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS UNSPSC 72-10-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-10-00
Description
SELECT INTERIOR RENOVATIONS OF FACILITIES 1: DEMOLITION, DF&HW, LGMF, LATHING AND PLASTERING, DRYWALL, CERAMIC TILE, RESILIENT FLOORING, CARPET, PAINTING, ACT, SPECIALTIES, CASEWORK, SOLID SURFACE TOPS, SPRINKLER, PLUMBING, HVAC, ELECTRICAL, LOW VOLTAGE, FIRE ALARM, TESTING.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves interior renovations at Logan International Airport, including substantial work like demolition, drywall installation, and HVAC systems. The project, overseen by CAPPROG - Capital Programs, is set to close proposals on February 18, 2026. This is a significant project within the UNPSC 72-10-00 category, targeting comprehensive facility upgrades.
CAPPROG aims to refresh the facilities at Logan International Airport through extensive interior renovations, ensuring modern functionality and compliance with updated standards.
- Demolition of existing structures
- Drywall installation
- Ceramic tile work
- Resilient flooring
- Carpeting
- Painting
- Installation of ACT (Acoustical Ceiling Tiles)
- Specialties installation
- Casework and solid surface tops
- Sprinkler system installation
- Company profile and experience in similar projects
- Detailed project approach and timeline
- Cost estimates and pricing strategy
- Resumes of key personnel
- References from past clients
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed project budget
- Clarification on safety and security protocols at the airport
- Information on local union requirements
- Preferred payment terms and conditions
- Specific design and architectural requirements for renovations
- Deadline for questions or request for information
- Any pre-bid conference details
- Clarifications on the bonding and insurance required
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.