Project 26-011 Adams Circle Roadway Reconstruction & Utility Improvements
Federal opportunity from RE01 - Real Estate Operations • Massachusetts Development Finance Agency. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: NAICS 72, 13, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
This IFB for the proposed project will consist of full depth roadway reclamation and resurfacing, construction of new pervious sidewalks, installation of a new water main with removal of the existing AC water main, installation of a new closed drainage system, and installation of conduit and duct banks for the purpose of undergrounding the existing overhead utilities in front of the proposed residential development. Bidders must be pre-qualified in MA DOT Highway Construction
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Project 26-011 Adams Circle Roadway Reconstruction & Utility Improvements involves critical infrastructure upgrades including full-depth roadway reclamation and resurfacing alongside utility improvements. The assignment requires bidders to undertake several activities, such as constructing new sidewalks and installing a closed drainage system. Importantly, only pre-qualified contractors in MA DOT Highway Construction are eligible, and responses are due by March 19, 2026.
The buyer aims to improve roadway infrastructure and utility systems in preparation for new residential development, ensuring modern, efficient, and safe functionalities.
- Contractors pre-qualified in MA DOT Highway Construction
- Firms with experience in roadway reclamation and utility installation
- Companies specializing in environmental and infrastructure projects
- Roadway reclamation and resurfacing
- Construction of new pervious sidewalks
- Installation of new water main
- Removal of existing AC water main
- Installation of closed drainage system
- Undergrounding existing overhead utilities with conduit and duct banks
- Proof of pre-qualification in MA DOT Highway Construction
- Detailed project approach and timeline
- Past performance references
- Cost proposal with detailed breakdown
- Insurance and bonding information
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to MA DOT Highway Construction regulations
- All submitted work must meet safety and environmental standards
- Consider fixed pricing based on detailed work breakdown
- Account for materials and labor costs in local market conditions
- Subcontracting opportunities for sidewalk construction and drainage system installation
- Potential partnerships with local materials suppliers to reduce costs
- Delays in obtaining necessary permits
- Potential unforeseen site conditions during reclamation
- Compliance with regulations on environmental impact
- What specific pre-qualification documents are required?
- Are there local resources available that can assist in the project?
- What is the timeline for permits and approvals?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Particular performance location details
- Specific funding sources for the project
- Evaluation criteria for the proposals
- Information on project budget
- Details of potential liabilities linked to the project
- List of mandatory safety standards
- Clarification on pre-qualification process
- Details about onsite conditions or constraints
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.