installation of four (4) light pole foundation at the GLTS Soccer Athletic Field, Andover, MA 01810.
Federal opportunity from GLTS - CB/Business Office • Greater Lawrence Technical School. Place of performance: MA. Response deadline: Apr 23, 2026. Industry: NAICS 72, 12, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
installation of four (4) light pole foundation at the GLTS Soccer Athletic Field, Andover, MA 01810.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves the installation of four light pole foundations at the GLTS Soccer Athletic Field in Andover, MA. With a response deadline of April 23, 2026, contractors will need to clearly understand the project requirements to formulate an effective bid. This project is expected to enhance the sporting facilities at GLTS and requires specific construction expertise.
The buyer aims to enhance the athletic field lighting by installing four foundations for light poles, improving the overall safety and usability of the field during evening activities.
- Construction contractors experienced in municipal projects
- Specialists in sports field infrastructure
- Companies with relevant state and local licenses
- Installation site preparation
- Excavation for light pole foundations
- Pouring concrete for foundations
- Ensuring structural integrity of installations
- Company profile and relevant experience
- Detailed project plan
- Cost estimates and pricing strategy
- Timeline for completion
- Safety and compliance certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local zoning laws and building codes
- Follow environmental regulations for construction in public spaces
- Obtain necessary permits before beginning work
- Competitive pricing based on local market rates
- Considerations for material and labor costs
- Potential for bundled pricing for additional or future projects
- Partnerships with local subcontractors for excavation and concrete work
- Collaboration with engineering firms for structural assessments
- Delays in permitting processes
- Weather-related disruptions during installation
- Potential cost overruns due to site conditions
- What specific standards or codes must be followed for installation?
- Are there existing utilities that need to be considered or avoided?
- What is the frequency of inspections during the construction phase?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No detailed specifications for foundation depth or dimensions provided
- Unclear if there is an existing contractor for preliminary assessments
- Lack of information regarding site conditions or soil integrity
- No historical context for prior construction at the site provided
- Absence of contact information for further inquiries
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.