Skip to content
Greater Lawrence Technical School

installation of four (4) light pole foundation at the GLTS Soccer Athletic Field, Andover, MA 01810.

Solicitation: Not available
Notice ID: ma_commbuys_a5240d8cb643ab894eb9
NAICS 72, 12, 00DepartmentGreater Lawrence Technical SchoolAgencyGLTS - CB/Business OfficeStateMAPostedDueApr 23, 2026, 11:00 AM UTCCloses in 5 days

Federal opportunity from GLTS - CB/Business Office • Greater Lawrence Technical School. Place of performance: MA. Response deadline: Apr 23, 2026. Industry: NAICS 72, 12, 00.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
John Lavoie 57 River Road Andover, MA 01810 US Email: jlavoie@glts.net Phone: (978) 686-0194 Ext. 1014 FAX: (978) 681-7783
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260023 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260018 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Essex
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
POWER EQUIPMENT OPERATOR (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Greater Lawrence Technical School
Agency
GLTS - CB/Business Office
Subagency
GLTS - CB/Business Office
Office
Cesarina Burgos
Contracting Office Address
Not available

Description

installation of four (4) light pole foundation at the GLTS Soccer Athletic Field, Andover, MA 01810.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 12, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves the installation of four light pole foundations at the GLTS Soccer Athletic Field in Andover, MA. With a response deadline of April 23, 2026, contractors will need to clearly understand the project requirements to formulate an effective bid. This project is expected to enhance the sporting facilities at GLTS and requires specific construction expertise.

light pole installationfoundationsathletic field constructionmunicipal contractsAndover MA
What the buyer is trying to do

The buyer aims to enhance the athletic field lighting by installing four foundations for light poles, improving the overall safety and usability of the field during evening activities.

Who should pursue this
  • Construction contractors experienced in municipal projects
  • Specialists in sports field infrastructure
  • Companies with relevant state and local licenses
Work breakdown
  • Installation site preparation
  • Excavation for light pole foundations
  • Pouring concrete for foundations
  • Ensuring structural integrity of installations
Response package checklist
  • Company profile and relevant experience
  • Detailed project plan
  • Cost estimates and pricing strategy
  • Timeline for completion
  • Safety and compliance certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local zoning laws and building codes
  • Follow environmental regulations for construction in public spaces
  • Obtain necessary permits before beginning work
Pricing strategy
  • Competitive pricing based on local market rates
  • Considerations for material and labor costs
  • Potential for bundled pricing for additional or future projects
Teaming and subs
  • Partnerships with local subcontractors for excavation and concrete work
  • Collaboration with engineering firms for structural assessments
Risks and watchouts
  • Delays in permitting processes
  • Weather-related disruptions during installation
  • Potential cost overruns due to site conditions
Smart questions to ask
  • What specific standards or codes must be followed for installation?
  • Are there existing utilities that need to be considered or avoided?
  • What is the frequency of inspections during the construction phase?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No detailed specifications for foundation depth or dimensions provided
  • Unclear if there is an existing contractor for preliminary assessments
  • Lack of information regarding site conditions or soil integrity
  • No historical context for prior construction at the site provided
  • Absence of contact information for further inquiries

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.