Project C2509 Antonucci Science MEP Repairs - See Attachment for more Info
Federal opportunity from FIADM - Finance and Administration • Fitchburg State University. Place of performance: MA. Response deadline: Apr 23, 2026. Industry: NAICS 72, 13, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
FSU Invites Bids for Project C2509 Antonucci Science MEP Repairs - See Attachment for more Info
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves bidding for the Antonucci Science MEP Repairs project at Florida State University, with a response deadline of April 23, 2026. Interested bidders must review the detailed specifications and requirements available in the attached document linked in the notice. This project falls under NAICS codes 72, 13, and 00, indicating a focus on facilities management and repairs within educational settings.
The buyer, Florida State University, is seeking bids to conduct mechanical, electrical, and plumbing (MEP) repairs for the Antonucci Science building, addressing current deficiencies and enhancing operational efficacy.
- Contractors with MEP experience in educational facilities.
- Companies familiar with the Florida State University bidding process.
- Firms with proven track records in project C2509-type repairs.
- Review project specifications from the attachment.
- Prepare and submit bid proposal by the deadline.
- Coordinate with subcontractors for specialized trades.
- Perform necessary site assessments if applicable.
- Completed bid proposal form.
- Company qualifications and project experience.
- Detailed cost estimate based on project requirements.
- References from previous similar projects.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local licensing requirements.
- Adhere to specified bidding guidelines listed in the attachment.
- Develop competitive pricing based on project scope and industry standards.
- Consider potential cost overruns due to unforeseen repairs.
- Electrical subcontractor with experience in educational facilities.
- Plumbing experts familiar with FSU regulations.
- General contractor with successful project management skills.
- Potential regulatory hurdles during repairs.
- Delays in procurement of materials could affect timelines.
- Loss of competitive edge if lacking innovation in approach.
- What specific MEP issues are prioritized for this project?
- Are there existing contracts with subcontractors that need to be navigated?
- What is the decision-making timeline post-submission of bids?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific details about MEP issues requiring repair.
- Estimated budget range for the project.
- Any existing contractor relationships that may affect bidding.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.