FSU invites Proposals for Project C2512B Boiler Repairs - Dupont Steam Plant
Federal opportunity from FIADM - Finance and Administration • Fitchburg State University. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS 72, 13, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
FSU invites Proposals for Project C2512B Boiler Repairs - Dupont Steam Plant - See Attachments Section for more information.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FSU is inviting proposals for the C2512B Boiler Repairs at the Dupont Steam Plant, with a response deadline of March 5, 2026. This project aims to address necessary repairs for operational efficiency. Bidders should refer to the attachments for detailed specifications and requirements related to the proposal.
The buyer is looking to engage a contractor for the necessary boiler repairs to ensure the Dupont Steam Plant operates efficiently and meets safety standards.
- Contractors with expertise in boiler repairs
- Firms with experience in industrial plant maintenance
- Companies familiar with FSU project requirements
- Assessment of existing boiler systems
- Preparation of repair plans
- Execution of repairs as per specifications
- Post-repair evaluation and reporting
- Completed proposal documents
- Technical approach and methodology
- Company qualifications and past performance
- Cost proposal with pricing breakdown
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with FSU's procurement guidelines
- Adhere to all safety regulations pertaining to boiler repair works
- Consider competitive pricing while ensuring quality work
- Include contingency costs for unforeseen issues
- Consider partnering with local subcontractors who have boiler repair experience
- Engage consultants for specialized assessments before bidding
- Potential scope changes during project execution
- Delays in materials procurement
- Worksite safety related to boiler repair operations
- What are the specific repair requirements outlined in the attachments?
- Are there any existing issues with the boiler that need special attention?
- What is the expected timeline for project completion and milestone deliverables?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific performance start or end dates provided
- Lack of detailed bid specifications in the brief
- No information on budget constraints or funding
- Absence of a site visit schedule
- No details on required qualifications or certifications for bidders
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.