Skip to content
Executive Office of Energy and Environmental Affairs

FY26 OLE Cloud-Hosted IMC Solution Project RFQ Ticket 373609

Solicitation: Not available
Notice ID: ma_commbuys_a7726fe86dd8d0433d89

Federal opportunity from IT - Information Technology • Executive Office of Energy and Environmental Affairs. Place of performance: MA. Response deadline: Feb 23, 2026. Industry: NAICS 81, 11, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,606,932,264
Sector total $1,606,932,264 • Share 100.0%
Live
Median
$85,110
P10–P90
$27,155$718,615
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,606,932,264)
Deal sizing
$85,110 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Energy & Environmental Affairs Information Technology 100 Cambridge Street 9th Floor Boston, MA 02114 US Email: eea-itadmin@mass.gov Phone: (617) 626-1222
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Executive Office of Energy and Environmental Affairs
Agency
IT - Information Technology
Subagency
IT - Information Technology
Office
Janeene Davis
Contracting Office Address
Not available

Description

Bid Opening Date equals Bid Closing Date.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The FY26 OLE Cloud-Hosted IMC Solution Project RFQ (Ticket 373609) seeks solutions from bidders for a critical cloud-hosted information management system. With a response deadline of February 23, 2026, the agency emphasizes the need for competitive bids, especially since it is open to a broad audience but does not have specific set-asides for small business preference. The bid opening date coincides with the closing date, underscoring the need for timely submissions.

Cloud-Hosted IMCInformation Management SystemIT ProcurementIntegrated SolutionsGovernment IT Projects
What the buyer is trying to do

The buyer aims to procure a cloud-hosted integrated management system to enhance operational efficiency within their IT department.

Who should pursue this
  • Cloud service providers
  • Software development firms
  • IT consulting companies specializing in integrated systems
Work breakdown
  • Solution Design
  • Implementation Plan
  • System Testing
  • User Training
  • Ongoing Support
Response package checklist
  • Technical proposal outlining solution features
  • Pricing structure
  • Company qualifications and experience
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must meet government IT security standards
  • Adhere to deadline strictly due to bid opening alignment
Pricing strategy
  • Develop competitive pricing aligned with expected market rates
  • Consider tiered pricing models based on service level agreements
Teaming and subs
  • Consider partnerships with data security firms
  • Engage subcontractors for specialized software development capabilities
Risks and watchouts
  • Tight response timeline may limit thorough proposal development
  • Potential for competition from established IT firms
  • Risk of non-compliance with government requirements if not properly addressed
Smart questions to ask
  • What specific functionalities are prioritized in the IMC solution?
  • Are there existing systems that the new solution must integrate with?
  • What is the budget range allocated for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific performance period details provided
  • Details on scoring criteria for bids are lacking
  • No information about the budget range available
  • Absence of specific agency contact for further inquiries
  • Clarification on the requirement for DAS certifications is missing

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.