Skip to content
Emergency Management Agency

PO 176 ResilientMass Plan Update

Solicitation: Not available
Notice ID: ma_commbuys_a9969d21943704f03a42

Federal opportunity from RMS00 - Recovery and Mitigation Section • Emergency Management Agency. Place of performance: MA. Response deadline: Jun 09, 2026. Industry: NAICS 77, 10, 00, 80.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,606,932,264
Sector total $1,606,932,264 • Share 100.0%
Live
Median
$85,110
P10–P90
$27,155$718,615
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,606,932,264)
Deal sizing
$85,110 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Massachusetts Emergency Management Agency - Fiscal Department 400 Worcester Road Framingham, MA 01702 US Email: katrina.robinson@mass.gov Phone: (508) 820-1406 FAX: (508) 820-1401
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Emergency Management Agency
Agency
RMS00 - Recovery and Mitigation Section
Subagency
RMS00 - Recovery and Mitigation Section
Office
Nila Lyubchik
Contracting Office Address
Not available

Description

This is a notice of an upcoming solicitation. The Statement of Work (SOW) will be issued and attached to this posting at a later date. Vendors are responsible for monitoring this posting for updates, amendments, and any additional information.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 09, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

RMS00 - Recovery and Mitigation Section issued solicitation PO 176 ResilientMass Plan Update, with NAICS 77, 10, 00, 80. This is a notice of an upcoming solicitation. The Statement of Work (SOW) will be issued and attached to this posting at a later date.

PO 176 ResilientMass Plan UpdateRMS00 - Recovery and Mitigation Section77100080
What the buyer is trying to do

This is a notice of an upcoming solicitation. The Statement of Work (SOW) will be issued and attached to this posting at a later date. Vendors are responsible for monitoring this posting for updates, amendments, and any additional information.

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
  • Firms eligible for SBPP Eligible: YES.
  • Teams aligned to NAICS 77, 10, 00, 80.
Work breakdown
  • PO 176 ResilientMass Plan Update
  • Review 1 linked source document.
  • Vendors are responsible for monitoring this posting for updates, amendments, and any additional information.
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
  • Validate eligibility for SBPP Eligible: YES.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Notice references set-aside: SBPP Eligible: YES.
  • Notice aligns to NAICS 77, 10, 00, 80.
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is Jun 9, 2026; verify exact due time and timezone.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.