Lakeview Avenue Water Main Project
Federal opportunity from DWSD1 - Dracut Water Supply District • Dracut Water Supply District. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS UNSPSC 83-10-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 83-10-15
Description
Sealed Bids for the construction of the Lakeview Avenue Water Main Project will be received by the Dracut Water Supply District at the Water Superintendentâ??s Office, 59 Hopkins Street, Dracut, MA, 01826 until 2:00 p.m. local time on March 5, 2026 at which time the Bids received will be publicly opened and read. Sealed Bids must have outer envelope marked as Lakeview Avenue Water Main Project.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Lakeview Avenue Water Main Project, managed by the Dracut Water Supply District, seeks sealed bids for construction until March 5, 2026. This project involves crucial infrastructure development and presents an opportunity for contractors skilled in public works. Bids will be publicly opened on the due date at the Water Superintendent’s Office in Dracut, MA.
The Dracut Water Supply District is aiming to engage contractors for the construction of new water main infrastructure, ensuring reliable water supply and system improvements in the Lakeview Avenue area.
- Preparation of the construction site
- Installation of water main materials
- Testing and inspection of the water main
- Finalization and restoration of the construction area
- Sealed bid submission
- Outer envelope marked as Lakeview Avenue Water Main Project
- Completed bid forms
- Compliance with all local construction codes
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget range for the project
- Detailed project scope and specifications
- Exact materials required for installation
- Pre-bid meeting information or site visit details
- Cleared permits or land ownership issues
- Information on project management and oversight
- Prior work examples preferred by the agency
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.