Skip to content
Division of Capital Asset Management and Maintenance

AD Proj #202600300 State Reclamation and Mosquito Control Board, Bedford, Billerica, Burlington etc.

Solicitation: Not available
Notice ID: ma_commbuys_93b0cf54e74ec0892508

Federal opportunity from DCP06 - Office of Leasing • Division of Capital Asset Management and Maintenance. Place of performance: MA. Response deadline: May 07, 2026. Industry: NAICS 80, 13, 15.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Lars Carlson 1 Ashburton Place, 15th Floor Boston, MA 02108 US Email: lars.carlson@mass.gov Phone: (617) 727-4050
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Capital Asset Management and Maintenance
Agency
DCP06 - Office of Leasing
Subagency
DCP06 - Office of Leasing
Office
David Tan
Contracting Office Address
Not available

Description

This RFP seeking approximately 5,100 square feet of Usable Area, but DCAMM would consider space of 4,500 to 5,500 of Garage, Office and Storage space in Bedford, Billerica, Burlington, Carlisle, Concord, Lexington, Lincoln, Needham, Newton, Waltham, Wayland, Wellesley, Weston or Woburn for a term of 10 years.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 30, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The RFP from the Office of Leasing is looking for approximately 5,100 square feet of usable area, with flexibility for spaces ranging from 4,500 to 5,500 square feet, suitable for garage, office, and storage use. The contract is intended to span a ten-year term and includes various locations such as Bedford and Burlington. Interested bidders should note the response deadline is set for May 7, 2026.

commercial leasingreal estatefacilities managementlong-term leaseoffice spacestorage space
What the buyer is trying to do

The buyer seeks to secure adequate facility space for the State Reclamation and Mosquito Control Board, ensuring it meets operational needs for the next ten years across multiple specified locations.

Who should pursue this
  • Property management firms
  • Real estate developers
  • Commercial leasing companies
Work breakdown
  • Identify suitable properties in specified towns
  • Evaluate properties based on usable area requirements
  • Prepare lease proposal documentation
  • Submit proposal by the deadline
Response package checklist
  • Completed proposal form
  • Proof of property availability
  • Floor plans or property layouts
  • Lease pricing structure
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local leasing regulations
  • Environmental compliance for chosen properties
Pricing strategy
  • Consider competitive market rates
  • Evaluate the total cost of leasing over ten years
Teaming and subs
  • Local real estate agents for property scouting
  • Legal consultants for lease agreements
Risks and watchouts
  • Local market fluctuations affecting lease rates
  • Property not meeting usage requirements after evaluation
  • Possible competition from other bidders
Smart questions to ask
  • What specific features are prioritized for the usable space?
  • Are there any restrictions or considerations for property types?
  • What are the evaluation criteria for the proposals submitted?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed evaluation criteria for proposals
  • Specific requirements for garage space
  • Clarification on utility provisions
  • Information on lease escalation rates
  • Potential funding sources for improvements
  • Details on the decision-making timeline
  • Inspection process for proposed properties
  • Any required certifications for facilities

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.