DCRRINKMC - RFQ for CM Firms - Charlestown - Emmons Horrigan O'Neil Memorial Rink
Federal opportunity from DCP04 - Bid Room • Division of Capital Asset Management and Maintenance. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS UNSPSC 72-13-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-13-00
Description
Request for Qualifications for Construction Management at Risk Services for DCR - Charlestown - Emmons Horrigan O'Neil Memorial Rink Charlestown, MA. This project scope is the building requires a new entrance, accessibility and life safety upgrades, shower/locker room improvements, new bleachers and mechanical, electrical and site improvements. This project includes demolition of the existing locker rooms with an addition to build out new locker rooms and a new main entrance.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The DCR is seeking Construction Management at Risk (CMAR) services for significant renovations at the Charlestown's Emmons Horrigan O'Neil Memorial Rink, with a response deadline set for March 5, 2026. The project includes comprehensive upgrades such as new entrance construction, accessibility improvements, and locker room renovations. This opportunity may be particularly attractive for firms with experience in municipal projects focused on accessibility and safety enhancements.
The buyer aims to select a qualified CM firm to oversee construction management services that include major renovations and upgrades to the existing rink facility, ensuring adherence to safety and accessibility standards.
- Site evaluation and analysis
- Demolition of existing locker rooms
- Construction of new locker rooms and main entrance
- Installation of new bleachers
- Mechanical, electrical, and site improvements
- Company profile and relevant experience
- Proposed project approach and timeline
- Team member qualifications and roles
- Cost proposal
- References from similar projects
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific project budget details are not provided
- Previous completion dates of similar projects not mentioned
- Scope for ongoing maintenance post-renovation is unclear
- Details regarding any existing contracts with contractors or suppliers are missing
- Clarification on required permits and approvals needed for the project
- Information on site logistics and constraints is lacking
- The procurement timeline for bid evaluation and award process is unspecified
- Specific material specifications are not included
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.